已截止
Moveable Shielding Concept Design Study
UK FUSION ENERGY LTD已就「Moveable Shielding Concept Design Study」發布此招標,現已不再接受新的投標。
此招標已不再接受新的投標。 類似的進行中招標
用淺白語言說明,這項招標是什麼?
此公告尚未翻譯,以原文語言顯示。
同類招標的過往批出紀錄說明了甚麼?
- 同類招標平均每項約有 2.7 份投標(11 項批出紀錄載有數目)。
- 半數同類合約的批出金額介乎 £49,651 至 £133,423,中位數為 £81,163。
根據過去 36 個月 134 項批出紀錄:相同工種、相同地區、金額相近。可信程度:高。以上只反映過往情況,並非預測結果。 批出合約資料
誰贏得這項招標,金額是多少?
此招標尚未公布批出結果。
公告全文
原文(English)
Moveable Shielding Concept Design Study
UKFE is seeking to appoint a supplier to provide a Concept Design Study for a Moveable Shielding requirement, as part of the STEP Prototype Power Plant. UKFE is leading the delivery of the STEP programme to design and build the UK’s first prototype fusion energy plant at West Burton, Nottinghamshire.
Please see the Tender Pack, available on the UKFE Delta Portal, for further details on this requirement, the rules of the procurement, and how to bid.
For more information about this opportunity, please visit the eSourcing portal at:
https://ukfe.delta-esourcing.com/tenders/UK-UK-Abingdon:-Engineering-services./2VD655382C
To respond to this opportunity, please click here:
https://ukfe.delta-esourcing.com/respond/2VD655382C
文件
以電郵接收這些招標
每天一封電郵,列出你所選行業及地區的新招標。無需帳戶或密碼。
快速解答
這項招標何時截止?
已於2026年9月17日截止。
這份合約價值多少?
採購方估計價值為£84,000。
採購方是誰?
採購方是UK FUSION ENERGY LTD。
同類招標通常有多少企業投標?
同類招標平均每項約有 2.7 份投標(11 項批出紀錄載有數目)。 根據過去 36 個月 134 項批出紀錄:相同工種、相同地區、金額相近。可信程度:高。以上只反映過往情況,並非預測結果。