跳到主要內容
Rallybid

進行中

ITT - 史雲頓檔案館脫碳設計團隊 (UID 320)

Historic England正在為「ITT - 史雲頓檔案館脫碳設計團隊 (UID 320)」尋找供應商。預計價值為£178,000。

我可以投標嗎?

建立免費帳戶,看看這個招標與你的業務有多契合,以及它有甚麼要求。

在哪裡及如何投標

  • 投標須經 In-Tend 提交。開始前請先在該平台登記為供應商。 前往 In-Tend
  • 向買家提問截止:2026年10月28日 下午05:00

買家對提交投標的說明: Please find further details of the project and submit any questions / submit your response to the procurement specific questionnaire (conditions of participation) via our free procurement portal : https://supplier.in-tend.co.uk/historicengland/home Please be aware at this Stage 1 (procurement specific questionnaire (conditions of participation)), we do not require a Tender returned. Only the stage 1 document.

用淺白語言說明,這項招標是什麼?

ITT - 史雲頓檔案館脫碳設計團隊 (UID 320)

英格蘭歷史遺產局正在尋找一個設計團隊,以協助改善其位於史雲頓的國家檔案館。該項目旨在透過更新建築系統和結構,提高其能源效益和環保性能。

採購方有什麼要求?

  • 領導項目完成 RIBA Stage 3(空間協調)
  • 審查和核實 RIBA Stage 2 的成果
  • 開發首選設計方案
  • 協調建築、結構和建築服務設計
  • 使用並開發客戶提供的 Revit BIM 模型進行設計協調
  • 準備和提交規劃申請

這項招標適合哪些人?

這適合擁有脫碳項目和檔案設施升級經驗的多學科設計團隊。

機器翻譯由 AI 翻譯,方便你閱讀。投標必須以採購方的語言(英文)撰寫。原文列於下方。 公告全文

為什麼這可能是快捷機會?

  • 價值適中

同類招標的過往批出紀錄說明了甚麼?

  • 同類招標平均每項約有 1.4 份投標(8 項批出紀錄載有數目)。
  • 半數同類合約的批出金額介乎 £112,221 至 £213,887,中位數為 £149,000。

根據過去 36 個月 107 項批出紀錄:相同工種、相同地區、金額相近。可信程度:高。以上只反映過往情況,並非預測結果。 批出合約資料

公告全文

原文(English)

ITT - Swindon Archive Decarbonisation Design Team (UID 320)

Historic England is seeking to appoint a multidisciplinary design team to develop the Archive Decarbonisation Project at its national archive facility in Swindon through RIBA Stage 3. Under the terms of this contract, we reserve the right to award RIBA stage 4 following the satisfactory completion of stage 3 and the receipt of an acceptable return for Stage 4 methodology and pricing schedule (in line with rates provided at stage 3). The Historic England Archive is one of the nation's most significant collections of records relating to England's historic environment. The purpose-built archive store was constructed in 1993 to BS5454 standards and provides specialist environmental conditions for the long-term preservation of nationally important photographic, film and documentary collections. However, the building and its associated mechanical and electrical systems were not designed with energy efficiency or net-zero objectives in mind. The project forms a key part of Historic England's commitment to achieve net-zero carbon emissions by 2040 and responds to the urgent requirement to replace ageing building services plant that has reached, and in some cases exceeded, its operational life. Recent equipment failures have highlighted the increasing risk to collection preservation, building resilience and operational continuity. A RIBA Stage 2 feasibility study has recently been completed. The study explored a range of options to reduce operational carbon, improve energy performance and secure the long-term sustainability of the archive while maintaining stringent environmental conditions required for collection care. Based on the information provided, Historic England's preferred option currently involves: • Replacement of existing end-of-life environmental control systems with significantly more energy-efficient solutions. • Rationalisation of archive environmental zones to improve operational efficiency. • Fabric improvements to enhance thermal performance and airtightness. • Fire safety upgrades and associated building works. • Creation of additional archive storage capacity through the repurposing of existing plant room space, reducing reliance on external storage facilities and supporting future collection growth. Scope of Services The appointed design team will be required to lead the project through: RIBA Stage 3 – Spatial Coordination Including but not limited to: • Review and validation of the completed RIBA Stage 2 outputs. • Development of the preferred design solution. • Coordination of architectural, structural and building services design, ensuring full integration of archive operational, conservation and storage requirements, and compliance with relevant standards and guidance, including BS EN 16893:2018 Evaluation and mitigation of collection care risks associated with proposed mechanical solutions. • Interpretation and integration of thermographic surveys, air-tightness testing and other specialist investigations. • Use and develop the client-provided Revit BIM model as the principal tool for multidisciplinary spatial coordination, ensuring that all proposed building-services systems, plant, access requirements and interfaces are accurately modelled and coordinated with the architectural and structural design. • Review, validate and develop the existing building physics model to a level appropriate for RIBA Stage 3, reflecting the spatially coordinated design and demonstrating performance against the agreed environmental requirements, energy and carbon targets, plant loads and future climate scenarios. • Planning application preparation and submission. • Cost planning and value management exercises. • Development of a robust whole-life cost and carbon assessment. • Stakeholder engagement and workshop facilitation. • Support Historic England’s fundraising activities for the project by providing reasonable information, evidence, and documentation to assist fundraising and grant applications where requested.

文件

以電郵接收這些招標

每天一封電郵,列出你所選行業及地區的新招標。無需帳戶或密碼。

我們會先以電郵發送確認連結。在你使用連結之前,不會發送任何其他內容。 私隱聲明

快速解答

這項招標何時截止?

公告沒有列明截止日期。請查閱採購方的入口網站。

這份合約價值多少?

採購方估計價值為£178,000。

採購方是誰?

採購方是Historic England。

我該如何投標?

請在採購方自己的入口網站投標,可從 Find a Tender 上的官方公告進入。Rallybid 協助你搜尋和準備,投標一律由真人提交。

我應該在哪裡提交投標?

經 In-Tend 提交。請先在該平台登記為供應商,然後在截止前提交。

向買家提問何時截止?

向買家提問(澄清問題)於 2026年10月28日 下午05:00 截止。

同類招標通常有多少企業投標?

同類招標平均每項約有 1.4 份投標(8 項批出紀錄載有數目)。 根據過去 36 個月 107 項批出紀錄:相同工種、相同地區、金額相近。可信程度:高。以上只反映過往情況,並非預測結果。

類似的進行中招標