已截止
Moveable Shielding Concept Design Study
UK FUSION ENERGY LTD已就“Moveable Shielding Concept Design Study”发布此招标,现已不再接受新的投标。
此招标已不再接受新的投标。 类似的进行中招标
用通俗的话说,这项招标是什么?
此公告尚未翻译,以原文语言显示。
同类招标的过往中标记录说明了什么?
- 同类招标平均每项约有 2.7 份投标(11 项中标记录载有数目)。
- 半数同类合同的中标金额介于 £49,651 至 £133,423,中位数为 £81,163。
根据过去 36 个月 134 项中标记录:相同工种、相同地区、金额相近。可信程度:高。以上仅反映过往情况,并非预测结果。 中标数据
谁赢得了这项招标,金额是多少?
此招标尚未公布中标结果。
公告全文
原文(English)
Moveable Shielding Concept Design Study
UKFE is seeking to appoint a supplier to provide a Concept Design Study for a Moveable Shielding requirement, as part of the STEP Prototype Power Plant. UKFE is leading the delivery of the STEP programme to design and build the UK’s first prototype fusion energy plant at West Burton, Nottinghamshire.
Please see the Tender Pack, available on the UKFE Delta Portal, for further details on this requirement, the rules of the procurement, and how to bid.
For more information about this opportunity, please visit the eSourcing portal at:
https://ukfe.delta-esourcing.com/tenders/UK-UK-Abingdon:-Engineering-services./2VD655382C
To respond to this opportunity, please click here:
https://ukfe.delta-esourcing.com/respond/2VD655382C
文件
通过邮件接收这些招标
每天一封邮件,列出你所选行业和地区的新招标。无需账户或密码。
快速解答
这项招标什么时候截止?
已于2026年9月17日截止。
这份合同价值多少?
采购方估计金额为£84,000。
采购方是谁?
采购方是UK FUSION ENERGY LTD。
同类招标通常有多少企业投标?
同类招标平均每项约有 2.7 份投标(11 项中标记录载有数目)。 根据过去 36 个月 134 项中标记录:相同工种、相同地区、金额相近。可信程度:高。以上仅反映过往情况,并非预测结果。