跳到主要内容
Rallybid

进行中

ITT - 斯温顿档案馆脱碳设计团队 (UID 320)

Historic England正在为“ITT - 斯温顿档案馆脱碳设计团队 (UID 320)”寻找供应商。预计金额为£178,000。

我可以投标吗?

创建免费账户,看看这个招标与你的业务有多契合,以及它有什么要求。

在哪里及如何投标

  • 投标须经 In-Tend 提交。开始前请先在该平台注册为供应商。 前往 In-Tend
  • 向买家提问截止:2026年10月28日 17:00

买家对提交投标的说明: Please find further details of the project and submit any questions / submit your response to the procurement specific questionnaire (conditions of participation) via our free procurement portal : https://supplier.in-tend.co.uk/historicengland/home Please be aware at this Stage 1 (procurement specific questionnaire (conditions of participation)), we do not require a Tender returned. Only the stage 1 document.

用通俗的话说,这项招标是什么?

ITT - 斯温顿档案馆脱碳设计团队 (UID 320)

英格兰历史遗产局正在寻找一个设计团队,以协助改善其位于斯温顿的国家档案馆。该项目旨在通过更新建筑系统和结构,提高其能源效益和环保性能。

采购方有什么要求?

  • 领导项目完成 RIBA Stage 3(空间协调)
  • 审查和核实 RIBA Stage 2 的成果
  • 开发首选设计方案
  • 协调建筑、结构和建筑服务设计
  • 使用并开发客户提供的 Revit BIM 模型进行设计协调
  • 准备和提交规划申请

这项招标适合哪些人?

这适合拥有脱碳项目和档案馆设施升级经验的多学科设计团队。

机器翻译由 AI 翻译,方便你阅读。投标必须使用采购方的语言(英语)撰写。原文列在下方。 公告全文

为什么这可能是快速机会?

  • 金额适中

同类招标的过往中标记录说明了什么?

  • 同类招标平均每项约有 1.4 份投标(8 项中标记录载有数目)。
  • 半数同类合同的中标金额介于 £112,221 至 £213,887,中位数为 £149,000。

根据过去 36 个月 107 项中标记录:相同工种、相同地区、金额相近。可信程度:高。以上仅反映过往情况,并非预测结果。 中标数据

公告全文

原文(English)

ITT - Swindon Archive Decarbonisation Design Team (UID 320)

Historic England is seeking to appoint a multidisciplinary design team to develop the Archive Decarbonisation Project at its national archive facility in Swindon through RIBA Stage 3. Under the terms of this contract, we reserve the right to award RIBA stage 4 following the satisfactory completion of stage 3 and the receipt of an acceptable return for Stage 4 methodology and pricing schedule (in line with rates provided at stage 3). The Historic England Archive is one of the nation's most significant collections of records relating to England's historic environment. The purpose-built archive store was constructed in 1993 to BS5454 standards and provides specialist environmental conditions for the long-term preservation of nationally important photographic, film and documentary collections. However, the building and its associated mechanical and electrical systems were not designed with energy efficiency or net-zero objectives in mind. The project forms a key part of Historic England's commitment to achieve net-zero carbon emissions by 2040 and responds to the urgent requirement to replace ageing building services plant that has reached, and in some cases exceeded, its operational life. Recent equipment failures have highlighted the increasing risk to collection preservation, building resilience and operational continuity. A RIBA Stage 2 feasibility study has recently been completed. The study explored a range of options to reduce operational carbon, improve energy performance and secure the long-term sustainability of the archive while maintaining stringent environmental conditions required for collection care. Based on the information provided, Historic England's preferred option currently involves: • Replacement of existing end-of-life environmental control systems with significantly more energy-efficient solutions. • Rationalisation of archive environmental zones to improve operational efficiency. • Fabric improvements to enhance thermal performance and airtightness. • Fire safety upgrades and associated building works. • Creation of additional archive storage capacity through the repurposing of existing plant room space, reducing reliance on external storage facilities and supporting future collection growth. Scope of Services The appointed design team will be required to lead the project through: RIBA Stage 3 – Spatial Coordination Including but not limited to: • Review and validation of the completed RIBA Stage 2 outputs. • Development of the preferred design solution. • Coordination of architectural, structural and building services design, ensuring full integration of archive operational, conservation and storage requirements, and compliance with relevant standards and guidance, including BS EN 16893:2018 Evaluation and mitigation of collection care risks associated with proposed mechanical solutions. • Interpretation and integration of thermographic surveys, air-tightness testing and other specialist investigations. • Use and develop the client-provided Revit BIM model as the principal tool for multidisciplinary spatial coordination, ensuring that all proposed building-services systems, plant, access requirements and interfaces are accurately modelled and coordinated with the architectural and structural design. • Review, validate and develop the existing building physics model to a level appropriate for RIBA Stage 3, reflecting the spatially coordinated design and demonstrating performance against the agreed environmental requirements, energy and carbon targets, plant loads and future climate scenarios. • Planning application preparation and submission. • Cost planning and value management exercises. • Development of a robust whole-life cost and carbon assessment. • Stakeholder engagement and workshop facilitation. • Support Historic England’s fundraising activities for the project by providing reasonable information, evidence, and documentation to assist fundraising and grant applications where requested.

文件

通过邮件接收这些招标

每天一封邮件,列出你所选行业和地区的新招标。无需账户或密码。

我们会先通过邮件向你发送确认链接。在你使用链接之前,不会发送任何其他内容。 隐私声明

快速解答

这项招标什么时候截止?

公告没有注明截止日期。请查看采购方的门户网站。

这份合同价值多少?

采购方估计金额为£178,000。

采购方是谁?

采购方是Historic England。

我该如何投标?

请在采购方自己的门户网站投标,可从 Find a Tender 上的官方公告进入。Rallybid 帮助你查找和准备,投标一律由真人提交。

我应该在哪里提交投标?

经 In-Tend 提交。请先在该平台注册为供应商,然后在截止前提交。

向买家提问何时截止?

向买家提问(澄清问题)于 2026年10月28日 17:00 截止。

同类招标通常有多少企业投标?

同类招标平均每项约有 1.4 份投标(8 项中标记录载有数目)。 根据过去 36 个月 107 项中标记录:相同工种、相同地区、金额相近。可信程度:高。以上仅反映过往情况,并非预测结果。

类似的进行中招标