S30093 Development of new Lead Safety Indicators validation and verification of selected recommended indicators
National Highways Limited已就「S30093 Development of new Lead Safety Indicators validation and verification of selected recommended indicators」批出此合約。
此招標已不再接受新的投標。 類似的進行中招標
用淺白語言說明,這項招標是什麼?
此公告尚未翻譯,以原文語言顯示。
同類招標的過往批出紀錄說明了甚麼?
- 同類招標平均每項約有 1.3 份投標(20 項批出紀錄載有數目)。
- 半數同類合約的批出金額介乎 £75,533 至 £150,000,中位數為 £99,982。
- AtkinsRéalis Jacobs Joint Venture 在過去三年從此採購方取得 9 份同類合約。
根據過去 36 個月 110 項批出紀錄:相同工種、相同地區、金額相近。可信程度:高。以上只反映過往情況,並非預測結果。 批出合約資料
誰贏得這項招標,金額是多少?
- WSP UK LTD獲批出此合約,金額為£99,857,日期為2026年8月3日。
公告全文
原文(English)
S30093 Development of new Lead Safety Indicators validation and verification of selected recommended indicators
National Highways Strategic Safety Team in the Road Safety Division want to procure
through the SPaTS 3 framework a Direct Award to WSP for the continued development
of Lead Safety Indicators (LSIs) project (T0631) through a re validating and verification
stage. In the National Highways 2024-25 annual delivery plan we committed to
developing a set of LSIs. ORR is following progress on this. It is understood that DfT is
expecting at least one lead safety indicator (in addition to the existing iRAP metric) to be
added to our formal organisational performance metrics during RIS3.
National Highways' key performance indicator for road user safety on the Strategic
Road Network (SRN) (KPI1) is a lagging indicator, focused on impacts. A lagging
indicator is reactive in nature and measures the performance of an aspiration or
outcome after an event has occurred. They don't tell us how we're performing at
preventing casualties and reducing future collision severity. There is also a time lag of
knowing the results of a lagging indicator, for example, 2024 stats 19 data was
published on 25 September 2025. Although measurable and quantifiable, lagging
indicators alone are not enough, and they don't provide insight into factors that lead to
those outcomes without in-depth analysis.
LSIs are proactive, preventive measures (or metrics) used to shed light on the level of
safety performance achieved in a system through monitoring and intervention. A lead
indicator attempts to measure control and preventative activities that precede or
indicate likely failures. They are designed to understand what is happening earlier in the
process in order to prevent and control lagging indicators. Therefore, to improve road
safety on the SRN (and reduce KSIs), there is a need to identify, monitor and positively
influence LSIs. Our iRAP performance indicator (percentage of traffic using iRAP 3 star
or above rated roads, and flow-weighted decimal star rating) is a lead indicator, but as
we are only able to conduct a full survey once every 5 years, we need additional
measures that can provide earlier and more frequent indication of safety performance
and therefore any need for change in approach or additional intervention within the 5
year period.
以電郵接收這些招標
每天一封電郵,列出你所選行業及地區的新招標。無需帳戶或密碼。
快速解答
這項招標何時截止?
已於2026年6月15日截止。
這份合約價值多少?
採購方估計價值為£100,000。
採購方是誰?
採購方是National Highways Limited。
同類招標通常有多少企業投標?
同類招標平均每項約有 1.3 份投標(20 項批出紀錄載有數目)。 根據過去 36 個月 110 項批出紀錄:相同工種、相同地區、金額相近。可信程度:高。以上只反映過往情況,並非預測結果。