已授予合同
S30093 Development of new Lead Safety Indicators validation and verification of selected recommended indicators
National Highways Limited已就“S30093 Development of new Lead Safety Indicators validation and verification of selected recommended indicators”授予此合同。
此招标已不再接受新的投标。 类似的进行中招标
用通俗的话说,这项招标是什么?
此公告尚未翻译,以原文语言显示。
同类招标的过往中标记录说明了什么?
- 同类招标平均每项约有 1.3 份投标(20 项中标记录载有数目)。
- 半数同类合同的中标金额介于 £75,533 至 £150,000,中位数为 £99,982。
- AtkinsRéalis Jacobs Joint Venture 在过去三年从该采购方取得 9 份同类合同。
根据过去 36 个月 110 项中标记录:相同工种、相同地区、金额相近。可信程度:高。以上仅反映过往情况,并非预测结果。 中标数据
谁赢得了这项招标,金额是多少?
- WSP UK LTD赢得此合同,金额为£99,857,日期为2026年8月3日。
公告全文
原文(English)
S30093 Development of new Lead Safety Indicators validation and verification of selected recommended indicators
National Highways Strategic Safety Team in the Road Safety Division want to procure
through the SPaTS 3 framework a Direct Award to WSP for the continued development
of Lead Safety Indicators (LSIs) project (T0631) through a re validating and verification
stage. In the National Highways 2024-25 annual delivery plan we committed to
developing a set of LSIs. ORR is following progress on this. It is understood that DfT is
expecting at least one lead safety indicator (in addition to the existing iRAP metric) to be
added to our formal organisational performance metrics during RIS3.
National Highways' key performance indicator for road user safety on the Strategic
Road Network (SRN) (KPI1) is a lagging indicator, focused on impacts. A lagging
indicator is reactive in nature and measures the performance of an aspiration or
outcome after an event has occurred. They don't tell us how we're performing at
preventing casualties and reducing future collision severity. There is also a time lag of
knowing the results of a lagging indicator, for example, 2024 stats 19 data was
published on 25 September 2025. Although measurable and quantifiable, lagging
indicators alone are not enough, and they don't provide insight into factors that lead to
those outcomes without in-depth analysis.
LSIs are proactive, preventive measures (or metrics) used to shed light on the level of
safety performance achieved in a system through monitoring and intervention. A lead
indicator attempts to measure control and preventative activities that precede or
indicate likely failures. They are designed to understand what is happening earlier in the
process in order to prevent and control lagging indicators. Therefore, to improve road
safety on the SRN (and reduce KSIs), there is a need to identify, monitor and positively
influence LSIs. Our iRAP performance indicator (percentage of traffic using iRAP 3 star
or above rated roads, and flow-weighted decimal star rating) is a lead indicator, but as
we are only able to conduct a full survey once every 5 years, we need additional
measures that can provide earlier and more frequent indication of safety performance
and therefore any need for change in approach or additional intervention within the 5
year period.
通过邮件接收这些招标
每天一封邮件,列出你所选行业和地区的新招标。无需账户或密码。
快速解答
这项招标什么时候截止?
已于2026年6月15日截止。
这份合同价值多少?
采购方估计金额为£100,000。
采购方是谁?
采购方是National Highways Limited。
同类招标通常有多少企业投标?
同类招标平均每项约有 1.3 份投标(20 项中标记录载有数目)。 根据过去 36 个月 110 项中标记录:相同工种、相同地区、金额相近。可信程度:高。以上仅反映过往情况,并非预测结果。