Rotherham Gateway Multi-Disciplinary Consultancy Support

Rotherham Metropolitan Borough Council已就「Rotherham Gateway Multi-Disciplinary Consultancy Support」批出此合約。

此招標已不再接受新的投標。 類似的進行中招標

用淺白語言說明,這項招標是什麼?

此公告尚未翻譯,以原文語言顯示。

同類招標的過往批出紀錄說明了甚麼?

  • 同類招標平均每項約有 4.9 份投標(11 項批出紀錄載有數目)。
  • 半數同類合約的批出金額介乎 £59,045 至 £396,424,中位數為 £145,436。

根據過去 36 個月 88 項批出紀錄:相同工種、相同地區。可信程度:高。以上只反映過往情況,並非預測結果。 批出合約資料

誰贏得這項招標,金額是多少?

  • Perfect Circle JV Ltd獲批出此合約,金額為£138,371,日期為2026年7月27日。

公告全文

原文(English)

Rotherham Gateway Multi-Disciplinary Consultancy Support

The Rotherham Gateway project is a multi-phased scheme to bring mainline rail services back to the Borough. Alongside the transport elements which also includes a new tram/train stop the scheme also delivers 300 new homes and an industry ecosystem, similar to the Advanced Manufacturing Park, associated car parking and public realm. The scheme can be considered in phases: • Phase 1 - mainline station and tram train plus catalyst station building, public realm and car parking • Phase 1a - Effingham St corridor, active travel scheme, masterplan & outputs • Phase 2 & 3 Innovation Gateway • Phase 4 Residential Quarter Phase 1 is moving into FBC and therefore the priority for this commission alongside Phase 1a which is essential to connect the Gateway site to the town centre. The remaining phases will be brought forward as funding and acquisition opportunities become available. The Council are seeking a Multi-Disciplinary team to support this phased programme of work for just over a 3-year period (with appropriate options to extend). Consultants are expected to provide the following services: • Lead Consultant • Programme Director • Programme Management Office • Project Management • Architectural, Design and Masterplanning The Multi-Disciplinary consultancy will also provide: • Cost Consultancy • Construction Design & Management role • Technical and Site Investigation Phased Approach Due to the complex nature of the project requirements the appointment and contractual arrangements will be undertaken in two stages. Stage 1 - the first stage will involve the establishment of the core team. This will include Lead Consultant, Programme Director, PMO and Project Management support for the progression of the Effingham St Active Travel corridor. During Stage 1, preparations will be made to form the requirements for Stage 2. Stage 1 is expected to last for 8 weeks and move seamlessly, subject to a satisfactory proposal received into Stage 2. Stage 2 - will form the main body of the commission. Due to the complexity of the Gateway project the full requirements of this stage will evolve over the lifetime of the project but will be limited to the services described above. The Stage 1 works are awarded at a cost of £138,370.92 with a total estimated contract value across both stages of £3,138,370 (all figures quoted as net). The end date stated of 02/10/2026 is only to the completion of stage 1. This award was undertaken as a direct award via Lot 1 (Built Environment Consultancy) of the SCAPE Consultancy framework.

以電郵接收這些招標

每天一封電郵,列出你所選行業及地區的新招標。無需帳戶或密碼。

我們會先以電郵發送確認連結。在你使用連結之前,不會發送任何其他內容。 私隱聲明

快速解答

這項招標何時截止?

已於2026年7月24日截止。

這份合約價值多少?

採購方估計價值為£3,138,170。

採購方是誰?

採購方是Rotherham Metropolitan Borough Council。

同類招標通常有多少企業投標?

同類招標平均每項約有 4.9 份投標(11 項批出紀錄載有數目)。 根據過去 36 個月 88 項批出紀錄:相同工種、相同地區。可信程度:高。以上只反映過往情況,並非預測結果。