跳到主要内容
Rallybid

已授予合同

Rotherham Gateway Multi-Disciplinary Consultancy Support

Rotherham Metropolitan Borough Council已就“Rotherham Gateway Multi-Disciplinary Consultancy Support”授予此合同。

此招标已不再接受新的投标。 类似的进行中招标

用通俗的话说,这项招标是什么?

此公告尚未翻译,以原文语言显示。

同类招标的过往中标记录说明了什么?

  • 同类招标平均每项约有 4.9 份投标(11 项中标记录载有数目)。
  • 半数同类合同的中标金额介于 £59,045 至 £396,424,中位数为 £145,436。

根据过去 36 个月 88 项中标记录:相同工种、相同地区。可信程度:高。以上仅反映过往情况,并非预测结果。 中标数据

谁赢得了这项招标,金额是多少?

  • Perfect Circle JV Ltd赢得此合同,金额为£138,371,日期为2026年7月27日。

公告全文

原文(English)

Rotherham Gateway Multi-Disciplinary Consultancy Support

The Rotherham Gateway project is a multi-phased scheme to bring mainline rail services back to the Borough. Alongside the transport elements which also includes a new tram/train stop the scheme also delivers 300 new homes and an industry ecosystem, similar to the Advanced Manufacturing Park, associated car parking and public realm. The scheme can be considered in phases: • Phase 1 - mainline station and tram train plus catalyst station building, public realm and car parking • Phase 1a - Effingham St corridor, active travel scheme, masterplan & outputs • Phase 2 & 3 Innovation Gateway • Phase 4 Residential Quarter Phase 1 is moving into FBC and therefore the priority for this commission alongside Phase 1a which is essential to connect the Gateway site to the town centre. The remaining phases will be brought forward as funding and acquisition opportunities become available. The Council are seeking a Multi-Disciplinary team to support this phased programme of work for just over a 3-year period (with appropriate options to extend). Consultants are expected to provide the following services: • Lead Consultant • Programme Director • Programme Management Office • Project Management • Architectural, Design and Masterplanning The Multi-Disciplinary consultancy will also provide: • Cost Consultancy • Construction Design & Management role • Technical and Site Investigation Phased Approach Due to the complex nature of the project requirements the appointment and contractual arrangements will be undertaken in two stages. Stage 1 - the first stage will involve the establishment of the core team. This will include Lead Consultant, Programme Director, PMO and Project Management support for the progression of the Effingham St Active Travel corridor. During Stage 1, preparations will be made to form the requirements for Stage 2. Stage 1 is expected to last for 8 weeks and move seamlessly, subject to a satisfactory proposal received into Stage 2. Stage 2 - will form the main body of the commission. Due to the complexity of the Gateway project the full requirements of this stage will evolve over the lifetime of the project but will be limited to the services described above. The Stage 1 works are awarded at a cost of £138,370.92 with a total estimated contract value across both stages of £3,138,370 (all figures quoted as net). The end date stated of 02/10/2026 is only to the completion of stage 1. This award was undertaken as a direct award via Lot 1 (Built Environment Consultancy) of the SCAPE Consultancy framework.

通过邮件接收这些招标

每天一封邮件,列出你所选行业和地区的新招标。无需账户或密码。

我们会先通过邮件向你发送确认链接。在你使用链接之前,不会发送任何其他内容。 隐私声明

快速解答

这项招标什么时候截止?

已于2026年7月24日截止。

这份合同价值多少?

采购方估计金额为£3,138,170。

采购方是谁?

采购方是Rotherham Metropolitan Borough Council。

同类招标通常有多少企业投标?

同类招标平均每项约有 4.9 份投标(11 项中标记录载有数目)。 根据过去 36 个月 88 项中标记录:相同工种、相同地区。可信程度:高。以上仅反映过往情况,并非预测结果。

类似的进行中招标