Powys Teaching Health Board已就「POW-ITT-64317 BRONLLYS 社區醫院 MONNOW 病房的平屋頂」發布此招標,現已不再接受新的投標。
用淺白語言說明,這項招標是什麼?
POW-ITT-64317 BRONLLYS 社區醫院 MONNOW 病房的平屋頂
這項招標旨在為位於 Brecon, Wales 的 Bronllys 社區醫院 Monnow 病房更換平屋頂。現有的屋頂覆蓋物和甲板狀況不佳,需要徹底拆除和更換。
採購方有什麼要求?
- 小心拆除和處理現有的屋頂覆蓋物、甲板及相關部件。
- 進行任何必要的結構、木材和甲板維修。
- 安裝新的 Alumasc 平屋頂系統,包括隔熱層、防水膜、飾邊和所有配件。
- 更換受影響的簷板和底板。
- 進行鉛修復並更換雨水排放裝置。
- 臨時拆除、重新安裝或更換斜屋頂連接處的瓦片,以確保適當的密封細節。
這項招標適合哪些人?
此機會適合有安裝 Alumasc 平屋頂系統經驗並曾在醫院建築上工作的屋頂承包商。
機器翻譯由 AI 翻譯,方便你閱讀。投標必須以採購方的語言(英文)撰寫。原文列於下方。 公告全文
公告全文
原文(English)
POW-ITT-64317 FLAT ROOF FOR MONNOW WARD, BRONLLYS COMMUNITY HOSPITAL
Powys Teaching Health Board (PTHB) require the replacement of the existing flat roof covering over Monnow Ward at Bronllys Community Hospital, Brecon. The existing waterproofing system and roof deck have been identified as being in poor condition, with deterioration attributed to natural ageing, water ingress, membrane shrinkage, failed laps, blistering and previous ineffective repair works. The roof deck is considered fragile in areas due to water ingress and is therefore to be removed and replaced.
The works will include the careful removal and disposal of the existing roof covering, deck and associated components, followed by any necessary structural, timber and deck repairs. Ridge and Partners LLP consultancy firm conducted a survey and have identified the appropriate roof to be a new Alumasc flat roofing system, including insulation, membranes, trims, upstands, abutments, outlets and accessories, is to be installed to provide a complete warranted system. Associated works include replacement of affected fascia and soffit boards, lead repairs, rainwater goods, and temporary removal and reinstatement/replacement of roof tiles at pitched roof abutments to achieve suitable upstand details.
The contract is to be administered under the JCT Minor Works Building Contract with Contractor’s Design, 2024 Edition. The contractor is required to satisfy themselves as to the existing conditions, extent of works and site constraints. Particular consideration should be given to safe access and edge protection, structural loading capacity, storage of materials at roof level, roof plant/services, drainage and falls, and maintaining the building weather-tight throughout the works.