Powys Teaching Health Board已就“POW-ITT-64317 BRONLLYS 社区医院 MONNOW 病房的平屋顶”发布此招标,现已不再接受新的投标。
用通俗的话说,这项招标是什么?
POW-ITT-64317 BRONLLYS 社区医院 MONNOW 病房的平屋顶
这项招标旨在为位于 Brecon, Wales 的 Bronllys 社区医院 Monnow 病房更换平屋顶。现有的屋顶覆盖物和甲板状况不佳,需要彻底拆除和更换。
采购方有什么要求?
- 小心拆除和处理现有的屋顶覆盖物、甲板及相关部件。
- 进行任何必要的结构、木材和甲板维修。
- 安装新的 Alumasc 平屋顶系统,包括隔热层、防水膜、饰边和所有配件。
- 更换受影响的檐板和底板。
- 进行铅修复并更换雨水排放装置。
- 临时拆除、重新安装或更换斜屋顶连接处的瓦片,以确保适当的密封细节。
这项招标适合哪些人?
此机会适合有安装 Alumasc 平屋顶系统经验并曾在医院建筑上工作的屋顶承包商。
机器翻译由 AI 翻译,方便你阅读。投标必须使用采购方的语言(英语)撰写。原文列在下方。 公告全文
公告全文
原文(English)
POW-ITT-64317 FLAT ROOF FOR MONNOW WARD, BRONLLYS COMMUNITY HOSPITAL
Powys Teaching Health Board (PTHB) require the replacement of the existing flat roof covering over Monnow Ward at Bronllys Community Hospital, Brecon. The existing waterproofing system and roof deck have been identified as being in poor condition, with deterioration attributed to natural ageing, water ingress, membrane shrinkage, failed laps, blistering and previous ineffective repair works. The roof deck is considered fragile in areas due to water ingress and is therefore to be removed and replaced.
The works will include the careful removal and disposal of the existing roof covering, deck and associated components, followed by any necessary structural, timber and deck repairs. Ridge and Partners LLP consultancy firm conducted a survey and have identified the appropriate roof to be a new Alumasc flat roofing system, including insulation, membranes, trims, upstands, abutments, outlets and accessories, is to be installed to provide a complete warranted system. Associated works include replacement of affected fascia and soffit boards, lead repairs, rainwater goods, and temporary removal and reinstatement/replacement of roof tiles at pitched roof abutments to achieve suitable upstand details.
The contract is to be administered under the JCT Minor Works Building Contract with Contractor’s Design, 2024 Edition. The contractor is required to satisfy themselves as to the existing conditions, extent of works and site constraints. Particular consideration should be given to safe access and edge protection, structural loading capacity, storage of materials at roof level, roof plant/services, drainage and falls, and maintaining the building weather-tight throughout the works.