跳到主要内容
Rallybid

已截止

Manchester International Airport - Demolition Works

Kier Transportation - CP7 NWC已就“Manchester International Airport - Demolition Works”发布此招标,现已不再接受新的投标。

此招标已不再接受新的投标。 类似的进行中招标

用通俗的话说,这项招标是什么?

此公告尚未翻译,以原文语言显示。

同类招标的过往中标记录说明了什么?

  • 半数同类合同的中标金额介于 £62,525 至 £162,593,中位数为 £105,000。

根据过去 36 个月 73 项中标记录:相同工种、相同地区、金额相近。可信程度:高。以上仅反映过往情况,并非预测结果。 中标数据

谁赢得了这项招标,金额是多少?

此招标尚未公布中标结果。

公告全文

原文(English)

Manchester International Airport - Demolition Works

"The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: -Installation, maintenance and removal of rail track protection. -Structural enabling and demolition works to an existing bridge structure. -Removal and disposal of road and pavement surfacing, kerbs, ducts and associated materials. -Careful removal and storage of existing coping stones and pilaster caps for potential reuse. -Demolition of existing parapets, pilasters, precast beams, cill beams and south abutment concrete. -Demolition and disposal of bridge structural elements in accordance with project requirements. -Working within a rail environment with compliance to all relevant safety and possession requirements."

文件

通过邮件接收这些招标

每天一封邮件,列出你所选行业和地区的新招标。无需账户或密码。

我们会先通过邮件向你发送确认链接。在你使用链接之前,不会发送任何其他内容。 隐私声明

快速解答

这项招标什么时候截止?

已于2026年9月3日截止。

这份合同价值多少?

采购方估计金额为£100,000。

采购方是谁?

采购方是Kier Transportation - CP7 NWC。

类似的进行中招标