Skip to content
Rallybid

Closed

Manchester International Airport - Demolition Works

Kier Transportation - CP7 NWC published this tender for "Manchester International Airport - Demolition Works". It is now closed to new bids.

This tender is closed to new bids. Similar open tenders

What is this tender, in plain English?

No plain-English summary yet.

What do past awards say about tenders like this?

  • Half of similar contracts were awarded between £62,525 and £162,593; the middle one was £105,000.

Based on 73 awards in the last 36 months: same trade, same region, similar value. Confidence: good. This describes the past; it does not predict a result. Award data

Who won this tender and for how much?

No award has been published for this tender yet.

The notice in full

"The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: -Installation, maintenance and removal of rail track protection. -Structural enabling and demolition works to an existing bridge structure. -Removal and disposal of road and pavement surfacing, kerbs, ducts and associated materials. -Careful removal and storage of existing coping stones and pilaster caps for potential reuse. -Demolition of existing parapets, pilasters, precast beams, cill beams and south abutment concrete. -Demolition and disposal of bridge structural elements in accordance with project requirements. -Working within a rail environment with compliance to all relevant safety and possession requirements."

Documents

Get these tenders by email

One email a day with new tenders for the trade and area you choose. No account or password needed.

We first email you a link to confirm. Nothing else is sent until you use it. Privacy notice

Quick answers

When is the deadline for this tender?

It closed on 3 September 2026.

How much is this contract worth?

The buyer estimates £100,000.

Who is the buyer?

The buyer is Kier Transportation - CP7 NWC.

Similar open tenders