跳到主要内容
Rallybid

进行中

FCDO 阿克拉英国高级专员公署办公室重建项目,加纳

Foreign, Commonwealth and Development Office正在为“FCDO 阿克拉英国高级专员公署办公室重建项目,加纳”寻找供应商。预计金额为£11,654,291。

我可以投标吗?

创建免费账户,看看这个招标与你的业务有多契合,以及它有什么要求。

在哪里及如何投标

  • 投标须经 Jaggaer 提交。开始前请先在该平台注册为供应商。 前往 Jaggaer
  • 公告没有提问截止日期,请尽早提问。

买家对提交投标的说明: Project_13589, pqq_2123 - PA23 PSQ - British High Commission Redevelopment Works, Accra, Ghana How to Register Your Company/Express Interest in this Project: 1. Register your company on the eSourcing portal (this is only required once) - Browse to the eSourcing Portal: https://fcdo.bravosolution.co.uk and click the link to register. Accept the terms and conditions and click "continue" - Enter your correct business and user details - Note the username you chose and click "Save" when complete - you will shortly receive an e-mail with your unique password (please keep this secure). 2. Login to th

用通俗的话说,这项招标是什么?

FCDO 阿克拉英国高级专员公署办公室重建项目,加纳

此项目旨在加纳阿克拉重建两个地块,为英国高级专员公署打造新的办公室。工程包括翻新现有建筑、拆除旧结构并安装新系统。目标是将目前状况不佳的办公大楼进行现代化改造。

采购方有什么要求?

  • 能够按照 NEC ECC 4,选项 A 合同形式施工。
  • 确保所有工程,包括分包商的工程,均符合相关的英国建筑标准。
  • 提供具备安全检查 (SC) 许可的人员,以管理与高安全性区域的界面工作。

这项招标适合哪些人?

此机会适合熟悉大型重建项目和英国建筑标准的资深建筑承包商。

机器翻译由 AI 翻译,方便你阅读。投标必须使用采购方的语言(英语)撰写。原文列在下方。 公告全文

为什么这可能是快速机会?

没有特别之处表明这是快速机会:请自行核对金额、截止日期和投标方式。

同类招标的过往中标记录说明了什么?

  • 同类招标平均每项约有 6.6 份投标(19 项中标记录载有数目)。
  • 半数同类合同的中标金额介于 £8,877,054 至 £20,462,531,中位数为 £12,250,000。

根据过去 36 个月 36 项中标记录:相同工种、相同地区、金额相近。可信程度:中。以上仅反映过往情况,并非预测结果。 中标数据

公告全文

原文(English)

FCDO Accra British High Commission Offices Redevelopment, Ghana

Project Overview 1.1 The route to market is the Competitive Flexible Procedure. This will comprise of a Request to Participate stage with Conditions of Participation questions and an Invitation to Tender stage. 1.2 The scope of the project is to redevelop two existing sites (Afadja and Volta) to accommodate the British High Commission. The British High Commission (Ghana) estate is made up of two sites that sit side by side. It is located on Julius Nyerere Link Road in a reasonably affluent and central part of Accra, close to Parliament, the Presidency and some Ministries. The office estate in Accra is tired and in poor condition (in places), having suffered from a lack of strategic investment and maintenance. 1.3 It is anticipated that the consturction will take place in phases. Work will start at the Volta site which will be vacant throughout construction (staff normally based at this site will be temporarily moved to the Afadja Site). Once construction works at the Volta site are complete, all of the staff at the Afadja site will be transferred to the Volta site to enable the phase 2 works to be undertaken in the unoccupied Afadja building. 1.4 In line with the overall estate strategy, the intention is to have the Volta HC Office staff move to the Afadja High Commission for the duration of the Volta construction period. 1.5 The existing sites comprises of: • An existing split-site office building. It is proposed that the Volta building be retained and refurbished. • Existing plant structures to be demolished to make way for new extension. • Existing external landscaping to be demolished in some areas to make way for new cloister and walkway. 1.6 Part of the site development design includes: • Undertaking minor works to the existing Afadja site to make suitable to be used as a decant property whilst works to the Volta building are undertaken. • Refurbish the existing building to a fit-for-purpose, open plan office standard. • Replacement of existing mechanical and electrical installations. • Seismic strengthening and associated structural works. • External works to create shared internal and external spaces. 1.7 The Contractor, as well as any engaged sub-contractors, are required to perform all work in accordance with the relevant UK Standards. The construction must meet established UK standards throughout the build process. 2. It is anticipated that the works will be undertaken under the NEC form of contract; ECC 4, Option A (Priced Contract with an Activity Schedule). 3. The project team is also considering the inclusion of an Early Contractor Involvement stage ahead of the construction stage. Both stages will be within the same contract. 4. Some areas of the building will be classified as higher security and will require a separate specialist contractor. These works will not form part of this requirement/contract. However, the parameter and interface between the higher classified areas and the works within this requirement will require security cleared personnel at Security Check (SC*) level to manage the works. Contractor’s will need to be able to provide such personnel before the works contract can begin. *SC is a process of security vetting. Further details can be found at https://www.gov.uk/government/publications/united-kingdom-security-vetting-clearance-levels/national-security-vetting-clearance-levels#security-check-sc. 5. Below is a schedule of key market engagement and tendering activities (subject to change): Activity Date Issue PSQ 20th November 2026 Issue ITT Early February 2027 Bidders day During ITT period Proposed Bid Deadline Late March 2027 Contract Award June 2027

文件

通过邮件接收这些招标

每天一封邮件,列出你所选行业和地区的新招标。无需账户或密码。

我们会先通过邮件向你发送确认链接。在你使用链接之前,不会发送任何其他内容。 隐私声明

快速解答

这项招标什么时候截止?

公告没有注明截止日期。请查看采购方的门户网站。

这份合同价值多少?

采购方估计金额为£11,654,291。

采购方是谁?

采购方是Foreign, Commonwealth and Development Office。

我该如何投标?

请在采购方自己的门户网站投标,可从 Find a Tender 上的官方公告进入。Rallybid 帮助你查找和准备,投标一律由真人提交。

我应该在哪里提交投标?

经 Jaggaer 提交。请先在该平台注册为供应商,然后在截止前提交。

同类招标通常有多少企业投标?

同类招标平均每项约有 6.6 份投标(19 项中标记录载有数目)。 根据过去 36 个月 36 项中标记录:相同工种、相同地区、金额相近。可信程度:中。以上仅反映过往情况,并非预测结果。

类似的进行中招标