跳到主要內容
Rallybid

籌劃中

Supply of Wastewater Sample Systems

United Utilities Water Limited已就「Supply of Wastewater Sample Systems」發布此招標,現已不再接受新的投標。

此招標已不再接受新的投標。 類似的進行中招標

用淺白語言說明,這項招標是什麼?

此公告尚未翻譯,以原文語言顯示。

誰贏得這項招標,金額是多少?

此招標尚未公布批出結果。

公告全文

原文(English)

Supply of Wastewater Sample Systems

United Utilities require the standardisation of the final effluent monitoring stations as part of UU's Project Blueprint programme. Project Blueprint is UU's strategic standardisation programme, focused on creating and deploying standardised assets, systems and solutions across the business. By adopting an industrialised approach to the design, procurement and delivery of assets, Blueprint aims to reduce engineering and commercial effort, improve delivery efficiency, lower whole-life costs and carbon emissions, and enhance operational consistency. All wastewater treatment works require final effluent monitoring. As part of AMP8 we have a large number of sites picking up numeric and phosphorous consents for the first time. Due to these 'first time' and additional consent projects are also coupled with a need to replace/update existing sites monitoring equipment sample systems are required for wastewater. Scope; To provide packaged final effluent monitoring stations using UU Framework Instruments. Instruments/displays are required to be mounted within a GRP kiosk on a suitable backboard arrangement. Variants include but are not limited to; To cover 'standard' sanitary determinants using turbidity (BOD, COD, Suspended Solids) To cover Ammonia & pH To cover p-removal - phosphorous (P and Fe), with space to add pH as an option

以電郵接收這些招標

每天一封電郵,列出你所選行業及地區的新招標。無需帳戶或密碼。

我們會先以電郵發送確認連結。在你使用連結之前,不會發送任何其他內容。 私隱聲明

快速解答

這項招標何時截止?

已於2027年5月31日截止。

這份合約價值多少?

公告沒有列明價值。

採購方是誰?

採購方是United Utilities Water Limited。

類似的進行中招標