跳到主要內容
Rallybid

已截止

Replacement Boiler for Aylsham Town Council

Aylsham Town Council已就「Replacement Boiler for Aylsham Town Council」發布此招標,現已不再接受新的投標。

此招標已不再接受新的投標。 類似的進行中招標

用淺白語言說明,這項招標是什麼?

此公告尚未翻譯,以原文語言顯示。

同類招標的過往批出紀錄說明了甚麼?

  • 半數同類合約的批出金額介乎 £38,856 至 £78,588,中位數為 £55,033。

根據過去 36 個月 51 項批出紀錄:相同工種、相同地區、金額相近。可信程度:高。以上只反映過往情況,並非預測結果。 批出合約資料

誰贏得這項招標,金額是多少?

此招標尚未公布批出結果。

公告全文

原文(English)

Replacement Boiler for Aylsham Town Council

1) New Town Hall Main Boiler • Supply and install new 2no. Commercial 48KW (total 96KW) high efficiency condensing boilers. Minimum 5 years manufacturer's guarantee • Boilers to be fitted in existing boiler room (cellar) at a suitable height to reduce risk from flooding. • Existing pipework to be re-routed to new boilers. • Supply and instal new flue liner in chimney stack. This may be subcontracted out but subcontractor will report to the successful contractor. • Flues to be connected to new flue liner. • Old boiler to be removed from site and disposed of. • New boilers to be plumbed in to new plate heat exchanger to split system up and keep existing system open vent, utilizing the existing header tank in loft. • New larger circulation pump fitted to serve original heating system. • System to be split into 2 zones. The first zone will be the original heating system and the second zone will consist of the Council Chamber and Archives room (first floor). • 2no. motorized valves. • New 35mm copper pipe work from boiler area installed to existing heating system. • System to be adapted to a sealed pressurized system with expansion vessel and filling loop. • System filter fitted to filter out debris in the heating system. • New 28mm copper gas pipe installed from gas meter to new boilers. • Boiler to be wired in to 3-amp fused spur. • Supply and fit HIVE smart heating controls to control 2 x zones for use with App. Provide instructions on app • Condense pipe from boiler plumbed into nearest drain. 2) Replace 2no. gas heaters with Fan assisted heaters • New fan assisted heater to be installed to replace gas heaters (2no.). One on the ground floor (Green Room) and one on the first floor (council chamber). • New pipe work from new boiler area fitted to new radiator locations. Pipe work to be surface mounted in copper but hidden, where possible underflooring. • Existing gas heaters to be removed and disposed of to make way for new radiators. • System will be flushed to comply with manufacture instructions, to remove sludge and debris, using a chemical cleaner. • System corrosion inhibitor will be introduced into the heating system. • Green room heater to be connected to Zone 1, council chamber to be connected to Zone 2. 3) Installation of 3no. Radiators • Installation of 2no. radiators in the archive room (zone 2). • Installation of 1no. radiator in the ground floor east toilet (zone 1). • Area to be connected with a 2 port valve and thermostat. • All necessary pipework supplied and fitted. 4) Other • Boiler will be commissioned and registered with Gas Safety Certificate • Warranty to be provided (with option of extension where available). • The Town Hall is a working building. All works to be programmed in in coordination with Town Council officers so that there is either minimal impact on hirers of the building, or the building can be closed for safety reasons. • Any damage to the fabric of the Town Hall should be made good • All waste materials to be cleared from site in accordance with the contractor's waste transfer licence. • The successful contractor will be expected to provide a risk assessment and method statement for the works, and provide evidence of Public Liability insurance. • A site visit is strongly recommended prior to pricing for works. This can be arranged through the Town Council's Maintenance Manager Gavin Watson (email gavin.watson@aylsham-tc.gov.uk or call 07585 600539)

文件

以電郵接收這些招標

每天一封電郵,列出你所選行業及地區的新招標。無需帳戶或密碼。

我們會先以電郵發送確認連結。在你使用連結之前,不會發送任何其他內容。 私隱聲明

快速解答

這項招標何時截止?

已於2026年9月30日截止。

這份合約價值多少?

採購方估計價值為£50,000。

採購方是誰?

採購方是Aylsham Town Council。

類似的進行中招標