Provision of Contingent Labour Services for Transport for Wales Infrastructure Maintenance Activities (Future Operating Model)

Transport for Wales (TFW)已就「Provision of Contingent Labour Services for Transport for Wales Infrastructure Maintenance Activities (Future Operating Model)」發布此招標,現已不再接受新的投標。

此招標已不再接受新的投標。 類似的進行中招標

用淺白語言說明,這項招標是什麼?

此公告尚未翻譯,以原文語言顯示。

同類招標的過往批出紀錄說明了甚麼?

  • 同類招標平均每項約有 13 份投標(5 項批出紀錄載有數目)。
  • 半數同類合約的批出金額介乎 £4,467,545 至 £8,763,181,中位數為 £5,341,639。

根據過去 36 個月 8 項批出紀錄:相同工種、相同地區、金額相近。可信程度:低。以上只反映過往情況,並非預測結果。 批出合約資料

誰贏得這項招標,金額是多少?

此招標尚未公布批出結果。

公告全文

原文(English)

Provision of Contingent Labour Services for Transport for Wales Infrastructure Maintenance Activities (Future Operating Model)

Transport for Wales (TfW) is developing a new multi-lot Framework agreement for the provision of Contingent Labour to support Transport for Wales (TfW) in fulfilling their Infrastructure Maintenance (IM) obligations on the Core Valley Lines (CVL). To support in fulfilling the Infrastructure Maintenance (IM) obligations, TfW require a compliant and efficient route to market to secure Contingent Labour to supplement its directly employed workforce to support the delivery of routine, planned maintenance activity for safety critical and off-track requirements across the CVL network with occasion reactive and emergency maintenance activity. Transport for Wales (TfW) is scheduled to assume the role of Infrastructure Manager (IM) in February 2028. This Framework will commence in September 2027 to support TfW's mobilisation activities and ensure operational readiness from Day One (February 2028) of the Infrastructure Manager (IM) transition. The Framework is intended to provide TfW with access to approved and compliant, temporary maintenance labour providers who can provide reliable, competent and appropriately assured labour in line with the volumes and response times required to meet maintenance demands, including short-notice and out-of-hours labour requirements. The multi-lot Framework will be structured to reflect requirements for Contingent Labour specialisms utilising on-track (safety critical) and off-track labour requirements to reflect market specialisms, delivery capability, and the range of requirements required to support the TfW Infrastructure Maintenance (IM) programme. The Framework is expected to comprise of a multi-lot structure, potentially including: Lot 1 – On-Track Operatives & Protection Staff Lot 2 – On-Track Plant (OTP) Operators & Machine / Crane Controllers Lot 3 – Electrification (OLE/OHLE) Operatives & Isolation Staff Lot 4 – Civils, Construction & General Trade Operatives Lot 5 – Plant Operators (Labour only) Lot 6 – Vegetation Management & Lineside Clearance Operatives Lot structure is subject to change following market engagement. The proposed framework structure, scope, and lotting structure is currently under development and will be presented to the market through a supply-chain engagement workshop to support the finalisation of the scope and procurement strategy to ensure it aligns to industry knowledge and capability, emerging trends, and customer needs. Transport for Wales intends to undertake a formal procurement exercise following completion of its supply chain market engagement activities.

以電郵接收這些招標

每天一封電郵,列出你所選行業及地區的新招標。無需帳戶或密碼。

我們會先以電郵發送確認連結。在你使用連結之前,不會發送任何其他內容。 私隱聲明

快速解答

這項招標何時截止?

公告沒有列明截止日期。請查閱採購方的入口網站。

這份合約價值多少?

採購方估計價值為£5,500,000。

採購方是誰?

採購方是Transport for Wales (TFW)。

同類招標通常有多少企業投標?

同類招標平均每項約有 13 份投標(5 項批出紀錄載有數目)。 根據過去 36 個月 8 項批出紀錄:相同工種、相同地區、金額相近。可信程度:低。以上只反映過往情況,並非預測結果。