曼徹斯特國際機場 - 架空線設備第三階段工程

此項目涉及曼徹斯特機場站的專業架空線設備(OLE)工程。目標是改造車站以容納更長的列車並增加月台容量。這將有助於改善曼徹斯特地區的列車服務和容量。

機器翻譯由 AI 翻譯,方便你閱讀。投標必須以採購方的語言(英文)撰寫。原文列於下方。 公告全文

同類招標的過往批出紀錄說明了甚麼?

  • 同類招標平均每項約有 1.8 份投標(8 項批出紀錄載有數目)。
  • 半數同類合約的批出金額介乎 £1,748,378 至 £4,318,641,中位數為 £3,212,970。

根據過去 36 個月 28 項批出紀錄:相同工種、相同地區、金額相近。可信程度:中。以上只反映過往情況,並非預測結果。 批出合約資料

誰贏得這項招標,金額是多少?

此招標尚未公布批出結果。

公告全文

原文(English)

Manchester International Airport - OLE Phase 3 Works

The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: - OLE Specialist Works for Manchester Airport Station Remodelling

文件

以電郵接收這些招標

每天一封電郵,列出你所選行業及地區的新招標。無需帳戶或密碼。

我們會先以電郵發送確認連結。在你使用連結之前,不會發送任何其他內容。 私隱聲明

快速解答

這項招標何時截止?

已於2026年10月9日截止。

這份合約價值多少?

採購方估計價值為£2,500,000。

採購方是誰?

採購方是Kier Transportation - CP7 NWC。

同類招標通常有多少企業投標?

同類招標平均每項約有 1.8 份投標(8 項批出紀錄載有數目)。 根據過去 36 個月 28 項批出紀錄:相同工種、相同地區、金額相近。可信程度:中。以上只反映過往情況,並非預測結果。