HAR6096 Bradwell Street車庫發展項目 - 新建房屋發展計劃

這是一個招標項目,旨在為倫敦貝斯納爾格林區建造七個新的四居室家庭住宅。該項目旨在增加Tower Hamlets的經濟適用房供應,其中一個住宅將專為輪椅使用者設計。

這項招標適合哪些人?

此項目適合有住宅物業建造經驗的建築公司,特別是那些熟悉在鐵路線附近受限制地點施工並採用節能建築原則的公司。

機器翻譯由 AI 翻譯,方便你閱讀。投標必須以採購方的語言(英文)撰寫。原文列於下方。 公告全文

同類招標的過往批出紀錄說明了甚麼?

  • 同類招標平均每項約有 5.4 份投標(10 項批出紀錄載有數目)。
  • 半數同類合約的批出金額介乎 £3,510,170 至 £9,000,000,中位數為 £7,289,631。

根據過去 36 個月 34 項批出紀錄:相同工種、相同地區、金額相近。可信程度:中。以上只反映過往情況,並非預測結果。 批出合約資料

誰贏得這項招標,金額是多少?

此招標尚未公布批出結果。

公告全文

原文(English)

HAR6096 Bradwell Street Garages Development - New Housing Development Scheme

Site Location: Former Bradwell Street Garage site, London, E1 4BY, Bethnal Green East ward. The development of this new housing scheme directly supports the Council’s strategic priority to increase the supply of affordable homes within the borough and address the growing challenges of homelessness and overcrowding. It aligns with the Council’s new 10-year Housing Strategy, More Homes. Better Homes. Safer Homes, which outlines the ambition to deliver high-quality homes for local residents. With over 30,000 households currently on the Council’s housing register, many families face significant difficulties in securing homes that are safe, secure, and suitable for their needs. The Bradwell Street development will deliver seven intentionally designed large family homes, all comprising four bedrooms. This includes one 4-bedroom, 8-person M4(3) wheelchair-accessible home, specifically designed to meet the needs of residents identified through Project 120—Tower Hamlets’ initiative supporting the borough’s most acutely disabled families. This purpose-built scheme places residents at the centre of the design process, ensuring that the needs of end users are fully considered and incorporated. The development has been designed in accordance with non-accredited Passivhaus principles, promoting enhanced energy efficiency and sustainability. The site is located adjacent to Network Rail on a constrained infill plot. The proposed construction programme reflects the challenges associated with Build Adjacent to Public Assets (BAPA) risks, with an estimated duration of approximately 18 months from groundbreaking to practical completion. The main works contract is expected to remain in place for a further 12 months post–practical completion to cover the defects liability period.

文件

以電郵接收這些招標

每天一封電郵,列出你所選行業及地區的新招標。無需帳戶或密碼。

我們會先以電郵發送確認連結。在你使用連結之前,不會發送任何其他內容。 私隱聲明

快速解答

這項招標何時截止?

已於2026年11月6日截止。

這份合約價值多少?

採購方估計價值為£5,033,052。

採購方是誰?

採購方是Tower Hamlets。

同類招標通常有多少企業投標?

同類招標平均每項約有 5.4 份投標(10 項批出紀錄載有數目)。 根據過去 36 個月 34 項批出紀錄:相同工種、相同地區、金額相近。可信程度:中。以上只反映過往情況,並非預測結果。