已授予合同
Provision of Planned Preventative Maintenance for the Chillers, AC Systems and Refrigeration
THE PIRBRIGHT INSTITUTE已就“Provision of Planned Preventative Maintenance for the Chillers, AC Systems and Refrigeration”授予此合同。
此招标已不再接受新的投标。 类似的进行中招标
用通俗的话说,这项招标是什么?
此公告尚未翻译,以原文语言显示。
同类招标的过往中标记录说明了什么?
- 同类招标平均每项约有 3.6 份投标(37 项中标记录载有数目)。
- 半数同类合同的中标金额介于 £114,380 至 £278,591,中位数为 £163,906。
根据过去 36 个月 112 项中标记录:相同工种、相同地区、金额相近。可信程度:高。以上仅反映过往情况,并非预测结果。 中标数据
谁赢得了这项招标,金额是多少?
此招标尚未公布中标结果。
公告全文
原文(English)
Provision of Planned Preventative Maintenance for the Chillers, AC Systems and Refrigeration
Contract Background
The contract is for single supplier for the provision of Chillers, Air Conditioning Systems and Refrigeration Maintenance Contract at The Pirbright Institute.
Scope of works
Work Package 1 – Chillers, Air Conditioning & Refrigeration Equipment
This works package is for a single supplier to service and or repair all refrigeration, air conditioning and associated systems at The Pirbright Institute.
Service visits should be arranged according to F gas regulations, site requirements and insurance inspections schedules.
The attached schedule (Schedule 5.C - Refrigeration Plant List) details the buildings, the details of the Chillers, Freezers and Air conditioning equipment and frequency of service visits required. A site plan showing the locations and relative sizes of these buildings is included in Schedule 5.D - Site Plan.
The contractor will be expected to advise on the condition of the equipment and provide details of any remedial works required following each service. Critical remedial works should be advised to Pirbright on the same day.
Quotations for non-critical remedial works should be provided to Pirbright within 1 week of a service visit.
The contractor should also allow for the supply of:
• 1 x vacuum pump
• 1 x recovery machine
• 1 x set of gauges
• 1 x refrigerant leak detector
These will be kept in our restricted areas and will only be used by the contractor. These can be taken out of containment and returned to contractor at the end of the contract. This is to prevent the unnecessary passage and time-consuming decontamination for contractor’s tools when work is being done on our contained systems.
Within the first 6 months of the contract the contractor will be expected to provide a critical spares list and an itemised quotation for all systems.
Service reports should be left on site or received by site on the day of the service and test certificates should be received by site within one week of the service visit.
In addition to providing their own access equipment, it is expected that the supplier will include in their works, performing basic tasks required to access equipment such as lifting ceiling panels.
Work Package 2 – Emergency Call out Service
The supplier of works package 1 must also provide a 24-hour emergency call out service. With an engineer site attendance time of under 4 hours. All specification requirements that are associated with work package 1 also apply this work package.
Work Package 3 – Insurance Inspection Facilitation
The contractor will need to allow for the supply of an engineer to aid our insurance inspector with PSSR inspections on chillers. This can take up to 5 days per year.
文件
通过邮件接收这些招标
每天一封邮件,列出你所选行业和地区的新招标。无需账户或密码。
快速解答
这项招标什么时候截止?
已于2026年9月21日截止。
这份合同价值多少?
采购方估计金额为£213,200。
采购方是谁?
采购方是THE PIRBRIGHT INSTITUTE。
同类招标通常有多少企业投标?
同类招标平均每项约有 3.6 份投标(37 项中标记录载有数目)。 根据过去 36 个月 112 项中标记录:相同工种、相同地区、金额相近。可信程度:高。以上仅反映过往情况,并非预测结果。