已截止
M6 Lune Gorge - Metalwork
KIER TRANSPORTATION LIMITED已就“M6 Lune Gorge - Metalwork”发布此招标,现已不再接受新的投标。
此招标已不再接受新的投标。 类似的进行中招标
用通俗的话说,这项招标是什么?
此公告尚未翻译,以原文语言显示。
同类招标的过往中标记录说明了什么?
- 同类招标平均每项约有 2.1 份投标(7 项中标记录载有数目)。
- 半数同类合同的中标金额介于 £284,017 至 £649,700,中位数为 £420,149。
根据过去 36 个月 57 项中标记录:相同工种、相同地区、金额相近。可信程度:高。以上仅反映过往情况,并非预测结果。 中标数据
谁赢得了这项招标,金额是多少?
此招标尚未公布中标结果。
公告全文
原文(English)
M6 Lune Gorge - Metalwork
Kier Infrastructure are looking to engage experienced and qualified Supplier for all metalworks related to the replacement of 14nr motorway bridges. Specifically but not limited to; Galleries on each structure / Stairways & steps re-installation to current regulations.
We will use the Build UK Common Assessment Criteria (CAS) to ensure a consistent minimum business competence. If your company possesses necessary qualifications and is interested in bidding for this project, please email infrastructure.procurement@kier.co.uk with your company's portfolio, relevant experience, and references for further evaluation.
文件
通过邮件接收这些招标
每天一封邮件,列出你所选行业和地区的新招标。无需账户或密码。
快速解答
这项招标什么时候截止?
已于2026年8月18日截止。
这份合同价值多少?
采购方估计金额为£500,000。
采购方是谁?
采购方是KIER TRANSPORTATION LIMITED。
同类招标通常有多少企业投标?
同类招标平均每项约有 2.1 份投标(7 项中标记录载有数目)。 根据过去 36 个月 57 项中标记录:相同工种、相同地区、金额相近。可信程度:高。以上仅反映过往情况,并非预测结果。