已授予合同
Looe Seafront Toilets roof refurbishment
Looe Town Council已就“Looe Seafront Toilets roof refurbishment”授予此合同。
此招标已不再接受新的投标。 类似的进行中招标
用通俗的话说,这项招标是什么?
此公告尚未翻译,以原文语言显示。
同类招标的过往中标记录说明了什么?
- 半数同类合同的中标金额介于 £55,980 至 £102,877,中位数为 £70,000。
根据过去 36 个月 40 项中标记录:相同工种、相同地区、金额相近。可信程度:高。以上仅反映过往情况,并非预测结果。 中标数据
谁赢得了这项招标,金额是多少?
- Pete Nicholls Roofing Ltd赢得此合同,金额为£60,773,日期为2026年8月4日。
公告全文
原文(English)
Looe Seafront Toilets roof refurbishment
We are not working with procurement agencies so please do not respond to contact from someone claiming to be working on behalf of Looe Town Council.
1. High Level Access approved by our Architect and HSE; to comply with CDM Regulations 2015 for commercial clients;
2. Complete re-roof including some Delabole slates, breathable membrane, soffits and facias.
The building roof, which although is in a Conservation Area is not listed, is owned by Looe Town Council, and has been diagnosed with nail sickness. The existing roof appears to be diminishing Delabole slate, mixed with inappropriate replacements; that will need to be removed. Depending on the work required, relevant permissions from Cornwall Council may be needed (PA26/02514 may be viewed for more info). Pre-tender visits to the site are encouraged and may be arranged by contacting the council.
The tender will be scored:
Methodology
Ability to keep the toilets and store open;
Materials and fixing methods (details to be provided);
Waste management;
How your business considers access and location issues;
Timescale i.e. availability for project start date and anticipated duration.
Experience
Your recent experience in similar works;
Any references you may present;
Recent CDM regulated works.
Please submit any information you feel appropriate in support of these areas.
SPECIFICATION
Contract Duration:
Project Timetable:
Reporting and Monitoring:
To be agreed with the successful tenderer
The deliverables of this project are identified as follows:
1. High Level Access approved by our Architect and HSE; to comply with CDM Regulations 2015 for
commercial clients;
2.Removal and disposal of any hazardous materials, including any asbestos, ensuring all legal and regulatory requirements are followed.
3 All waste materials to be removed by contractor from site during these works and only very limited waste shall be stored on site;
4 Undertake the replacement of the roof; including but not limited to:
a. Re-use existing Delabole slates (where possible) and ridge tiles;
b. Supply and fit replacement materials as best suited for the building in a Conservation Area;
c. Install new eaves support trays;
d. Install new lead soakers to valleys;
e. Install new breathable membrane and battens;
f. Install facia vents, new facias, soffits, gutters;
g. Remove and Install new Lintels;
h. In consultation with Cornwall Council Building Control, assist the council to secure any necessary permissions and consents for the signing off/completion of the work.
5 Provide a breakdown of costs for each element of the work;
6 Provide an outline work schedule/timeline specifying anticipated start and completion times;
7 Submit an overall cost for the project, which will be valid for 6 months from the award of contract;
8 Seafront Mens, Ladies and Accessible Toilet shall remain open for the duration of these works. Access to the Seafront Store shall continue for the duration of these works.
Additional information: PLEASE NOTE: We are not working with any third party procurement agencies for this tender so please do not respond to any contact from someone claiming to be working on behalf of Looe Town Council. Please also only direct questions to deputy.clerk@looetowncouncil.gov.uk or town.clerk@looetowncouncil.gov.uk
通过邮件接收这些招标
每天一封邮件,列出你所选行业和地区的新招标。无需账户或密码。
快速解答
这项招标什么时候截止?
已于2026年7月10日截止。
这份合同价值多少?
采购方估计金额为£50,000。
采购方是谁?
采购方是Looe Town Council。