跳到主要内容
Rallybid

进行中

London Construction Programme General Works Framework MW25-GW

London Borough of Haringey正在为“London Construction Programme General Works Framework MW25-GW”寻找供应商。

我可以投标吗?

创建免费账户,看看这个招标与你的业务有多契合,以及它有什么要求。

在哪里及如何投标

  • 公告刊登于 Find a Tender;买家文件会说明在哪里提交投标。 前往 Find a Tender
  • 公告没有提问截止日期,请尽早提问。

用通俗的话说,这项招标是什么?

此公告尚未翻译,以原文语言显示。

为什么这可能是快速机会?

没有特别之处表明这是快速机会:请自行核对金额、截止日期和投标方式。

同类招标的过往中标记录说明了什么?

  • 同类招标平均每项约有 6.2 份投标(46 项中标记录载有数目)。
  • 半数同类合同的中标金额介于 £204,452 至 £4,414,721,中位数为 £555,629。

根据过去 36 个月 201 项中标记录:相同工种、相同地区。可信程度:高。以上仅反映过往情况,并非预测结果。 中标数据

公告全文

原文(English)

London Construction Programme General Works Framework MW25-GW

The London Construction Programme (LCP) on behalf of Haringey Council is procuring a new general works framework. The scope of works will include a wide range of works across multiple types of buildings including individual, multiple occupancy, residential, commercial, heritage, community and those operated by the public sector on a 24 hour basis (i.e. police, health, fire and rescue, care homes etc.). The scope of the works will include (but not limited to), new buildings, MMC, planned and preventative maintenance, refurbishment, retrofit, fire safety works, heritage related works, remediations, mechanical and engineering services, renewable energy systems and adaptations. The Framework will be established for a period of 5 years and will be available to any public sector body in London and the Home Counties. It is anticipated the framework will commence in September 2025. The London Construction Programme was established in 2012 by Haringey Council was, encouraged and supported by other London Local Authorities through London Councils, to develop a pan-London strategy to improve construction related procurement and establish a suite of collaborative contractual vehicles which public sector organisations can utilise. The LCP currently has a total membership of over 60 Public Sector organisations in London and Home County. The LCP is a 'virtual organisation' currently hosted and operated by Haringey Council. The current LCP Framework (MW19) expired in October 2024. This new Framework is to provide General Works construction and General Works construction related activities for new build developments, building related planned component replacement, fire safety, remediations, retrofit and refurbishments according to the Lot Categories. The services will be procured in 16 lots: Lot GN1 New Build up to £7.5m contract value Lot GN2 New Build £6m - £15m contract value Lot GN3 New Build £14m+ contract value Lot GNPS New Build £1+ (i.e.no minimum contract value) Lot GF1 Fire Safety Works up to £7.5m contract value Lot GF2 Fire Safety Works £6m - £15m contract value Lot GF3 Fire Safety Works £14m+ contract value Lot GFPS Fire Safety Works £1+ (i.e.no minimum contract value) Lot GR1 Refurbishment and Retrofit up to £7.5m contract value Lot GR2 Refurbishment and Retrofit £6m - £15m contract value Lot GR3 Refurbishment and Retrofit £14m+ contract value Lot GRPS Refurbishment and Retrofit £1+ (i.e.no minimum contract value) Lot GP1 Planned Preventative Maintenance up to £7.5m contract value Lot GP2 Planned Preventative Maintenance £6m - £15m contract value Lot GP3 Planned Preventative Maintenance £14m+ contract value Lot GPPS Planned Preventative Maintenance £1+ (i.e.no minimum contract value) Tenderers are restricted to applying for a maximum of two sub lots, plus the PS sub lot in each of the primary Lots (i.e. New Build, Fire Safety Works, refurbishment and retrofit, Planned Preventative Maintenance). There are reserved places for micro and small enterprises on different Lots in order to encourage SMEs and provide choice for its Clients. A Reserve List will also be used for this framework for those Tenderers who are unsuccessful in being awarded a place on the primary Lots. The framework will be established with four main objectives in mind:- 1. To support its Clients to deliver on their net zero commitments in the following areas:- • Biodiversity assets • Climate Change adaptation • Zero Carbon Supply Chain • Low Carbon Transportation • Operational Low Carbon 2. To provide a fast and efficient route to market for education schemes across London and the Home Counties that offers value for money. 3. To drive positive changes in mental health and equality, diversity and inclusion in the construction sector. 4. To apply best practice, unlock innovation and work collaboratively with its Client and the Supply Chain.

通过邮件接收这些招标

每天一封邮件,列出你所选行业和地区的新招标。无需账户或密码。

我们会先通过邮件向你发送确认链接。在你使用链接之前,不会发送任何其他内容。 隐私声明

快速解答

这项招标什么时候截止?

公告没有注明截止日期。请查看采购方的门户网站。

这份合同价值多少?

公告没有注明金额。

采购方是谁?

采购方是London Borough of Haringey。

我该如何投标?

请在采购方自己的门户网站投标,可从 Find a Tender 上的官方公告进入。Rallybid 帮助你查找和准备,投标一律由真人提交。

我应该在哪里提交投标?

公告没有指明投标平台。买家的招标文件会说明在哪里及如何提交。

同类招标通常有多少企业投标?

同类招标平均每项约有 6.2 份投标(46 项中标记录载有数目)。 根据过去 36 个月 201 项中标记录:相同工种、相同地区。可信程度:高。以上仅反映过往情况,并非预测结果。

类似的进行中招标