跳到主要内容
Rallybid

筹划中

GMCA 2171 Strategic Environmental Assessment

Greater Manchester Combined Authority已就“GMCA 2171 Strategic Environmental Assessment”发布此招标,现已不再接受新的投标。

此招标已不再接受新的投标。 类似的进行中招标

用通俗的话说,这项招标是什么?

此公告尚未翻译,以原文语言显示。

同类招标的过往中标记录说明了什么?

  • 同类招标平均每项约有 3.6 份投标(5 项中标记录载有数目)。
  • 半数同类合同的中标金额介于 £60,425 至 £2,937,988,中位数为 £471,376。

根据过去 36 个月 22 项中标记录:相同工种、相同地区。可信程度:中。以上仅反映过往情况,并非预测结果。 中标数据

谁赢得了这项招标,金额是多少?

此招标尚未公布中标结果。

公告全文

原文(English)

GMCA 2171 Strategic Environmental Assessment

Strategic Environmental Assessment (SEA) - Greater Manchester Joint Minerals and Waste Plan The Greater Manchester Combined Authority is undertaking an expression of interest for the following: Strategic Environmental Assessment (SEA) to support the forthcoming Greater Manchester Joint Minerals and Waste Plan (GMJMWP). The 10 Greater Manchester authorities (Bolton, Bury, Manchester, Oldham, Rochdale, Salford, Stockport, Tameside, Trafford and Wigan) are working together to produce the Greater Manchester Joint Minerals and Waste Plan. This will be a single plan to replace the existing Minerals Plan and Waste Plan, which were adopted in 2013 and 2012 respectively. The plan will be developed working in partnership with local authorities and a specialist third-party and will be produced in line with the Town and Country Planning (Local Planning)(England) Regulations 2026 under the new plan-making system. The SEA will be required as part of this work, to identify any environmental effects as a result of implementing the plan, and any reasonable alternatives. The timetable for the GMJMWP is to be agreed but, under transitional arrangements set out in the 2026 Regulations, the 10 authorities are required to give notice of commencement of plan making before 31st December 2026 and to pass through Gateway 1 by 30th April 2027. The proposed commission comprises the following activities: - Strategic Environmental Assessment for Greater Manchester Joint Minerals and Waste Plan - Preparation and consultation on the scope and level of detail of the SEA Environmental Report. This will run at the same time as the consultation on the proposed minerals and waste plan content and evidence. - Preparation and consultation on the proposed SEA Environmental Report. This will run at the same time as the as consultation on the proposed minerals and waste plan. - Review and finalise SEA Environmental Report prior to ‘Gateway 3’.

通过邮件接收这些招标

每天一封邮件,列出你所选行业和地区的新招标。无需账户或密码。

我们会先通过邮件向你发送确认链接。在你使用链接之前,不会发送任何其他内容。 隐私声明

快速解答

这项招标什么时候截止?

公告没有注明截止日期。请查看采购方的门户网站。

这份合同价值多少?

采购方估计金额为£120,000。

采购方是谁?

采购方是Greater Manchester Combined Authority。

同类招标通常有多少企业投标?

同类招标平均每项约有 3.6 份投标(5 项中标记录载有数目)。 根据过去 36 个月 22 项中标记录:相同工种、相同地区。可信程度:中。以上仅反映过往情况,并非预测结果。

类似的进行中招标