跳到主要内容
Rallybid

已授予合同

Gas Servicing and Planned Maintenance Heating Replacement Works 2026-2030

Glen Oaks Housing Association已就“Gas Servicing and Planned Maintenance Heating Replacement Works 2026-2030”授予此合同。

此招标已不再接受新的投标。 类似的进行中招标

用通俗的话说,这项招标是什么?

此公告尚未翻译,以原文语言显示。

同类招标的过往中标记录说明了什么?

  • 同类招标平均每项约有 8.7 份投标(168 项中标记录载有数目)。
  • 半数同类合同的中标金额介于 £317,500 至 £6,000,000,中位数为 £1,800,000。

根据过去 36 个月 204 项中标记录:相同工种、相同地区。可信程度:高。以上仅反映过往情况,并非预测结果。 中标数据

谁赢得了这项招标,金额是多少?

  • BRB Electrical Limited赢得此合同,金额为£758,817,日期为2026年10月1日。 收到的投标数量:8.

公告全文

原文(English)

Gas Servicing and Planned Maintenance Heating Replacement Works 2026-2030

The Contract primarily involves Gas Servicing, Boiler Replacement Works though installation of new condensing combination boilers, controls and flues throughout tenant occupied properties within Glasgow. The works may also include replacement of existing heating pipework to existing properties. Specifically the services and works are envisaged to include; An annual gas service and reactive maintenance (including parts) to each property, also including the recording, testing and service to existing smoke, heat and CO detectors. At the date of inviting tenders, Glen Oaks Housing Association require the annual gas service and reactive maintenance to be provided to 1,345no properties; and Replacement of existing boilers with new condensing combination boilers, control and flues to approximately 100 properties during financial year 2026-2027, 218 properties during financial year 2027-2028, 218 properties during financial year 2028-2029 and 218 properties during financial year 2029-2030. The works may also include replacement of existing pipework to approximately 20% of properties during the Boiler Replacement Works programmes. The Contract duration is forty-two months from the commencement date of 1 October 2026 until 31 March 2030. Subject to satisfactory performance of the Contractor, which will be assessed through measurement of the Key Performance Indicator’s (Refer Tender Document 8) it is intended that the Contract will be further extended annually in twelve months increments up to a maximum of two further years and an overall maximum contract completion date of 31 March 2032. In addition to Gas Servicing, the Contract extension period may also include further boiler and pipework replacement works during financial years 2030-2031 and 2031-2032. However the number of properties that may require boiler and pipework replacement works between 1 April 2030 and 31 March 2032 has still to be determined by Glen Oak Housing Association at the date of inviting tenders.

通过邮件接收这些招标

每天一封邮件,列出你所选行业和地区的新招标。无需账户或密码。

我们会先通过邮件向你发送确认链接。在你使用链接之前,不会发送任何其他内容。 隐私声明

快速解答

这项招标什么时候截止?

公告没有注明截止日期。请查看采购方的门户网站。

这份合同价值多少?

公告没有注明金额。

采购方是谁?

采购方是Glen Oaks Housing Association。

同类招标通常有多少企业投标?

同类招标平均每项约有 8.7 份投标(168 项中标记录载有数目)。 根据过去 36 个月 204 项中标记录:相同工种、相同地区。可信程度:高。以上仅反映过往情况,并非预测结果。

类似的进行中招标