筹划中
Fountain Lake Jetty - Main Works Contract
Defence Infrastructure Organisation已就“Fountain Lake Jetty - Main Works Contract”发布此招标,现已不再接受新的投标。
此招标已不再接受新的投标。 类似的进行中招标
用通俗的话说,这项招标是什么?
此公告尚未翻译,以原文语言显示。
同类招标的过往中标记录说明了什么?
- 同类招标平均每项约有 2.7 份投标(20 项中标记录载有数目)。
- 半数同类合同的中标金额介于 £72,000 至 £2,410,835,中位数为 £390,450。
根据过去 36 个月 152 项中标记录:相同工种、相同地区。可信程度:高。以上仅反映过往情况,并非预测结果。 中标数据
谁赢得了这项招标,金额是多少?
此招标尚未公布中标结果。
公告全文
原文(English)
Fountain Lake Jetty - Main Works Contract
Scope of Services and Deliverables:
The project comprises of the full regeneration of the complete Fountain Lake Jetty. The key construction activities are divided into 4 phases and include following:
Phases 1 and 2 comprise FLJ East, at approximately 375m long.
Phase 1 covers the enabling works, such as the re-routing of services, strengthening of impounding wall area including height raising and provision of access route, while Phase 2 covers the demolition of the existing jetty, construction of the new jetty, and associated dredging.
Phases 3 and 4 comprise FLJ West, at approximately 275m.
Phase 3 covers the enabling works, such as the re-routing of services, strengthening of impounding wall area including height raising and provision of access route, while Phase 4 covers the demolition of the existing jetty, construction of the new jetty, and associated dredging.
The Contractor provides technical support to the Project Manager to support the evaluation and selection of a preferred solution for all phases of Works and in preparing the design ahead of the four phases of work, as noted above, and achieving the Marine Licence which facilitates works commencing on the West section.
This procurement will be open to all NATO countries following NCB+ procedures.
通过邮件接收这些招标
每天一封邮件,列出你所选行业和地区的新招标。无需账户或密码。
快速解答
这项招标什么时候截止?
公告没有注明截止日期。请查看采购方的门户网站。
这份合同价值多少?
采购方估计金额为£600,000,000。
采购方是谁?
采购方是Defence Infrastructure Organisation。
同类招标通常有多少企业投标?
同类招标平均每项约有 2.7 份投标(20 项中标记录载有数目)。 根据过去 36 个月 152 项中标记录:相同工种、相同地区。可信程度:高。以上仅反映过往情况,并非预测结果。