跳到主要内容
Rallybid

已截止

Estates Strategy

City College Plymouth已就“Estates Strategy”发布此招标,现已不再接受新的投标。

此招标已不再接受新的投标。 类似的进行中招标

用通俗的话说,这项招标是什么?

此公告尚未翻译,以原文语言显示。

同类招标的过往中标记录说明了什么?

  • 同类招标平均每项约有 1.5 份投标(10 项中标记录载有数目)。
  • 半数同类合同的中标金额介于 £40,453 至 £108,688,中位数为 £71,151。

根据过去 36 个月 200 项中标记录:相同工种、相同地区、金额相近。可信程度:高。以上仅反映过往情况,并非预测结果。 中标数据

谁赢得了这项招标,金额是多少?

此招标尚未公布中标结果。

公告全文

原文(English)

Estates Strategy

Introduction and Background City College Plymouth provides general further education, higher education and work-based learning to the city of Plymouth and surrounding areas. As a leading provider of vocational training in the Southwest, it has a vision to be the learning destination of choice, providing learning without limits at the heart of the local community. The 5-year Estates Strategy (2026-2031) will outline the roadmap to transform the College property portfolio into a sustainable, efficient, and curriculum-led environment. The strategy will prioritise the alignment of physical assets with modern technical education, maximizing space utilization, and reducing carbon emissions to meet institutional net-zero targets. One of the first Institutes of Technology, City College Plymouth has recently been awarded National Defence Technical Excellence College status. This means the College is set to play an increasingly important national and international role in developing the highly skilled workforce required to support the UK's defence capability and wider economic growth. Another exciting collaboration with Plymouth City Council is the £50m regeneration of the Civic Centre, which will be converted into 144 apartments and a new city centre campus containing the Blue Green Skills Hub, which will train up to 2,000 students a year across 60 different courses. Strategic Objectives The new Estates Strategy will both drive and respond to these key developments and opportunities, building on this vision and helping to shape the future careers of thousands of young people and adults. The new strategy will have the following strategic goals: 1. To align with the DfE 10-year national education estates strategy 2. To provide industry-standard, good condition and right sized teaching spaces which support delivery of the curriculum, demands of local employers and needs of strategic partners. 3. To reduce running costs by consolidating under-utilised space, planning maintenance activities and identifying obsolete assets. 4. To set a pathway for operating an estate which is financially and environmentally sustainable The Existing Estate The College occupies several sites in the city with most activity taking place at the Kings Road campus. This 13-acre freehold campus accommodates over 29,000m2 of floor space, of which approximately half requires improvement to achieve the strategic goals above and to meet government estate condition objectives for the FE sector. Leased properties include Picquet Barracks (1,900m2), Oceansgate (750m2), Pinpoint (700m2) and Norwich Union House (1,500m2). The last two are used by a college subsidiary, Achievement Training Limited. The redevelopment of the Civic Centre will add another 5,500m2 to the estate from 2031. In response to the recent DfE Condition Data Collection, the College has commissioned an independent building condition survey, which will run in parallel with the development of this estates strategy. Methodology The new estates strategy will include the following core information projected over the 5-year period: 1. Executive Summary and Strategic Context 2. Analysis of the current estate 3. Curriculum Strategy & Plan 4. Space Utilisation Analysis 5. Future Estate Objectives 6. Options appraisal 7. Funding and Finance 8. Implementation plan Deliverables The final report will be presented to both the Executive Leadership Team and the Board of Governors (two separate presentations at Kings Road) The following key outputs will be required as appendices to the report • Asset register tracking tenure, age, condition and compliance status for each building • Five-year, costed programme of maintenance and investment • Disposal and acquisition schedule (if recommended) • Space utilisation report • Curriculum space model mapping projected enrolments to accommodation capacities • Costed carbon reduction plan • Estates risk register • Dashboard of key performance indicators for estate management Timescale It is anticipated that the estates strategy will take approximately four months to prepare and the following provisional timeline has been identified • Request for Quotation published July 2026 • Latest date for queries from interested parties 21 August • Return date for fee proposals 31 August • Interview short listed practices early Sept • Appoint successful practice mid to late Sept • Period for site familiarisation and review of information October • Submit draft report for review January 2027 • Presentations to ELT and Governors February 2027 Fee proposal Include the following information in your fee proposal: 1. Lump Sum Fee (exclusive of VAT) stating any assumptions or exclusions 2. Day rates for out-of-scope tasks; additional expenses not included in 1. 3. Resource plan showing breakdown of lump sum fee and required payment schedule. 4. GANTT chart mapping project deliverables 5. Case studies of similar work undertaken for Further Education colleges 6. Description and relevant experience of your proposed team

文件

通过邮件接收这些招标

每天一封邮件,列出你所选行业和地区的新招标。无需账户或密码。

我们会先通过邮件向你发送确认链接。在你使用链接之前,不会发送任何其他内容。 隐私声明

快速解答

这项招标什么时候截止?

已于2026年9月2日截止。

这份合同价值多少?

采购方估计金额为£60,000。

采购方是谁?

采购方是City College Plymouth。

同类招标通常有多少企业投标?

同类招标平均每项约有 1.5 份投标(10 项中标记录载有数目)。 根据过去 36 个月 200 项中标记录:相同工种、相同地区、金额相近。可信程度:高。以上仅反映过往情况,并非预测结果。

类似的进行中招标