DfI TRAM T-1171 Interim Surfacing Contract 2026 - ISCW1 Dungannon

DfI Transport and Road Asset Management (TRAM)已就“DfI TRAM T-1171 Interim Surfacing Contract 2026 - ISCW1 Dungannon”授予此合同。

此招标已不再接受新的投标。 类似的进行中招标

用通俗的话说,这项招标是什么?

此公告尚未翻译,以原文语言显示。

同类招标的过往中标记录说明了什么?

  • 半数同类合同的中标金额介于 £53,792 至 £553,260,中位数为 £103,234。

根据过去 36 个月 20 项中标记录:相同工种、相同地区。可信程度:中。以上仅反映过往情况,并非预测结果。 中标数据

谁赢得了这项招标,金额是多少?

此招标尚未公布中标结果。

公告全文

原文(English)

DfI TRAM T-1171 Interim Surfacing Contract 2026 - ISCW1 Dungannon

The Contracting Authority is responsible for the maintenance and improvement of the public road network within the contract area, including carriageways, footways and associated highway infrastructure. This procurement relates to Interim Surfacing Contract ISC W1 (Dungannon), a below-threshold Measured Term Contract (MTC) for the delivery of road surfacing maintenance and improvement works on the public road network. The contract will be initially awarded for a period of two months, with the option, at the sole discretion of the Contracting Authority, of further extensions up to a maximum term of twelve months, subject to operational requirements and satisfactory performance. The contract will operate as a Measured Term Contract, with individual works commissioned through the issue of Works Orders. The Contractor shall undertake surfacing and associated highway works within the designated contract area as instructed by the Contracting Authority. Works Orders will generally range in value from £50,001 to £750,000. The scope of works may include, but is not limited to, the following activities: • Carriageway resurfacing and asphalt surfacing works; • Delivery of multiple concurrent resurfacing schemes across the network; • Carriageway reshaping and profile correction works; • Provision, operation and removal of Temporary Traffic Management; • Adjustment of ironwork and street furniture to new road levels; • Adjustment, renewal and installation of kerbs and kerb lines; • Adjustment, repair and installation of highway drainage systems; • Provision and reinstatement of road markings, road studs and associated traffic management measures; and • Any other ancillary works necessary for the successful completion of surfacing and maintenance schemes. This procurement is being undertaken as an interim and time-limited arrangement to ensure continuity of essential highway maintenance services and the delivery of safety critical resurfacing works within the Dungannon contract area. The Contracting Authority requires this short-term delivery mechanism to maintain service provision pending the establishment and mobilisation of a replacement surfacing contract procured through the Road Asset Management (RAM) Surfacing Framework, in accordance with the Department's established procurement strategy and longer-term delivery model.

文件

通过邮件接收这些招标

每天一封邮件,列出你所选行业和地区的新招标。无需账户或密码。

我们会先通过邮件向你发送确认链接。在你使用链接之前,不会发送任何其他内容。 隐私声明

快速解答

这项招标什么时候截止?

已于2026年8月11日截止。

这份合同价值多少?

采购方估计金额为£5,160,000。

采购方是谁?

采购方是DfI Transport and Road Asset Management (TRAM)。