Eastleigh Borough Council已就“为 KINGS COPSE AVENUE 开发项目交付 192 套新房屋和公寓的设计与建造承包商,位于汉普郡伊斯特利”发布此招标,现已不再接受新的投标。
用通俗的话说,这项招标是什么?
为 KINGS COPSE AVENUE 开发项目交付 192 套新房屋和公寓的设计与建造承包商,位于汉普郡伊斯特利
Eastleigh Borough Council 正在寻找一名主要承包商,负责在汉普郡伊斯特利的 Botley 设计和建造 192 套新的混合产权房屋,包括房屋和公寓。这个名为 Kings Copse Avenue 的开发项目是理事会房屋计划的关键部分。
采购方有什么要求?
- 在 2026 年 11 月 11 日之前完成一份采购专用问卷 (PSQ)
- 通过 PSQ 中设定的“参与条件”问题
- 展示将被评估和计分的技术能力
- 如果受邀,提交一份价格建议书和一份针对该开发项目的技术建议书
- 如果受邀参加投标邀请 (ITT) 阶段,则参加面试
- 如果要求,可能需要提交最佳及最终报价 (BAFO)
这项招标适合哪些人?
此机会适合在设计和建造大型住宅开发项目方面具有专业知识的经验丰富的主要承包商。
机器翻译由 AI 翻译,方便你阅读。投标必须使用采购方的语言(英语)撰写。原文列在下方。 公告全文
公告全文
原文(English)
DESIGN AND BUILD CONTRACTOR FOR THE DELIVERY OF 192 NEW HOUSES AND APARTMENTS AT KINGS COPSE AVENUE DEVELOPMENT, EASTLEIGH, HAMPSHIRE.
Eastleigh Borough Council (the Authority) is seeking to appoint an expert Main Contractor to undertake the design & build of 192 new mixed tenure homes in Botley, Eastleigh, Hampshire.
Full development consent has been secured in 2026. The Authority committed itself to provide new homes, services and infrastructure, at this development, known as Kings Copse Avenue (KCA).
KCA is a key part of the Authority's self-delivery of housing pipeline. A dedicated project delivery team has been established that has overseen the planning stages and will support delivery of the development.
Planning Application (F/25/100141) lists the permission secured for the 192 new homes, the Authority has an adopted policy of 'infrastructure first' and commits to progress our own developments at pace, taking all reasonable steps ahead of a main contractor award, to de-risk the development, to aid a swift start, leading to occupations.
The programme anticipates a start on site in Q3 2027, first plot completions in early 2028 and final completion in late 2030, delivering all 192 plots together as a single phase with the associated infrastructure, soft and hard landscaping and open spaces.
The Authority seeks to appoint the works required at KCA, pursuant to a JCT Design and Build Contract 2024. Further details in relation to KCA and the works required are provided in the Project Brief, which is provided as part of the associated tender documents for this procurement.
The contract will be awarded as one Lot.
This procurement process is following a competitive flexible procedure under the Procurement Act 2023 and is split into the following phases.
Phase 1 - Procurement Specific Questionnaire (PSQ)
Potential suppliers will be required to complete a Procurement Specific Questionnaire (PSQ) compromising:
• Pass/fail questions setting out Conditions of Participation
• Questions on technical capabilities which will be evaluated and scored.
The PSQ is to be returned by 11/11/2026, with clarifications closing on 06/11/2026.
The Authority intends that it will invite a minimum of the four highest scoring potential suppliers - based on the scored technical capability responses - that satisfy Conditions of Participation to participate in an invitation to tender (ITT) stage.
Phase 2 - Invitation to Tender (ITT)
The ITT phase is intended to comprise of:
• A pricing submission;
• A development specific technical submission; and
• Interviews with potential suppliers.
Each submission and the interviews will be evaluated and scored. If the Authority does not conduct a BAFO stage, the contract will be awarded to the supplier whose tender is determined to be the most advantageous tender following evaluation of the ITT submission and interview in accordance with the award criteria and assessment methodology set out in the associated tender documents provided to suppliers invited to the ITT stage.
Phase 3 - Optional BAFO Stage
Following evaluation of the initial tenders and interviews, the Authority reserves the right, but is not obliged, to invite all potential suppliers remaining in the procedure to submit a Best and Final Offer ("BAFO").
The Authority may invoke the BAFO stage where it considers that suppliers should be given an opportunity to improve their tenders in relation to price, quality and/or contractual matters before the final award decision. If the BAFO stage is used, the Authority will notify participating suppliers of the timetable, permitted scope of revisions and applicable submission requirements.