跳到主要内容
Rallybid

已截止

Crane Concept Design Study

UK FUSION ENERGY LTD已就“Crane Concept Design Study”发布此招标,现已不再接受新的投标。

此招标已不再接受新的投标。 类似的进行中招标

用通俗的话说,这项招标是什么?

此公告尚未翻译,以原文语言显示。

同类招标的过往中标记录说明了什么?

  • 半数同类合同的中标金额介于 £50,300 至 £136,830,中位数为 £89,970。

根据过去 36 个月 74 项中标记录:相同工种、相同地区、金额相近。可信程度:高。以上仅反映过往情况,并非预测结果。 中标数据

谁赢得了这项招标,金额是多少?

此招标尚未公布中标结果。

公告全文

原文(English)

Crane Concept Design Study

UKFE is inviting bids from the market so it can appoint a suitably qualified supplier to deliver a Crane Concept Design Study, in support of the SPP. The STEP Prototype Powerplant (SPP) is a programme of work to build, commission and demonstrate fusion power in the UK. The key goal of the project is to operate a powerplant that places net power on the UK grid from fusion energy in the 2040’s. West Burton Power Station, Retford, was announced as the home for STEP (Spherical Tokamak for Energy Production) in October 2022. Staff also work at Culham Science Centre in Abingdon. Further details on the technical specification are provided in the tender pack, on the UKFE Delta procurement portal. This contract follows earlier market engagement which demonstrated sufficient capability and interest in the market for a tender exercise to be run. For more information about this opportunity, please visit the eSourcing portal at: https://ukfe.delta-esourcing.com/tenders/UK-UK-Abingdon:-Lifting-and-handling-equipment./W5S3379557 To respond to this opportunity, please click here: https://ukfe.delta-esourcing.com/respond/W5S3379557

文件

通过邮件接收这些招标

每天一封邮件,列出你所选行业和地区的新招标。无需账户或密码。

我们会先通过邮件向你发送确认链接。在你使用链接之前,不会发送任何其他内容。 隐私声明

快速解答

这项招标什么时候截止?

已于2026年7月28日截止。

这份合同价值多少?

采购方估计金额为£84,000。

采购方是谁?

采购方是UK FUSION ENERGY LTD。