已截止
CA18284 - R9367 - SHGH - MRI REPLACEMENT - BUILDING REGULATION PRINCIPAL DESIGNER AND ARCHITECT - QUOTE
Epsom & St Helier University Hospitals NHS Trust已就“CA18284 - R9367 - SHGH - MRI REPLACEMENT - BUILDING REGULATION PRINCIPAL DESIGNER AND ARCHITECT - QUOTE”发布此招标,现已不再接受新的投标。
此招标已不再接受新的投标。 类似的进行中招标
用通俗的话说,这项招标是什么?
此公告尚未翻译,以原文语言显示。
同类招标的过往中标记录说明了什么?
- 半数同类合同的中标金额介于 £35,284 至 £75,000,中位数为 £53,000。
根据过去 36 个月 73 项中标记录:相同工种、相同地区、金额相近。可信程度:高。以上仅反映过往情况,并非预测结果。 中标数据
谁赢得了这项招标,金额是多少?
此招标尚未公布中标结果。
公告全文
原文(English)
CA18284 - R9367 - SHGH - MRI REPLACEMENT - BUILDING REGULATION PRINCIPAL DESIGNER AND ARCHITECT - QUOTE
The Trust is seeking to appoint a suitably qualified and experienced Architect, who will also undertake the role of Building Regulations Principal Designer (BRPD) under the Building Safety Act 2022, to provide full professional services for the replacement of an existing MRI scanner at St Helier Hospital.
The commission shall encompass RIBA Stages 2-7 and include, but not be limited to, the development of the architectural design, multidisciplinary design coordination, Building Regulations Principal Designer duties, statutory approvals, stakeholder engagement, tender support, contract administration (where instructed), construction phase support and project close-out.
The project involves the replacement of an existing MRI scanner within a live acute healthcare environment and is anticipated to include significant enabling and alteration works, including:
Removal and replacement of the existing MRI scanner.
Temporary and permanent removal and reinstatement of sections of the external façade to facilitate equipment installation.
Internal demolition, structural alterations and reconfiguration of accommodation.
MRI shielding requirements, including RF shielding, magnetic shielding and Faraday cage interfaces.
MRI quench pipe design coordination and associated building alterations.
Compliance with MRI safety requirements, including zoning, controlled access, emergency procedures and operational workflows.
Coordination of mechanical, electrical and public health engineering services, including ventilation, electrical infrastructure, lighting, medical equipment interfaces, fire alarm, access control, communications and associated builders' works.
Fire compartmentation, fire stopping and Building Regulations compliance.
Coordination with Structural, MEP, Fire, Radiation Protection and MRI equipment specialists.
Compliance with all relevant Health Technical Memoranda (HTMs), Health Building Notes (HBNs), Building Safety Act 2022, Building Regulations, British Standards, NHS guidance and other statutory requirements.
Preparation and management of all Building Safety Act documentation applicable to the project, including coordination with the Client and Principal Contractor throughout the design and construction phases.
Attendance at design team meetings, stakeholder workshops, site inspections and commissioning activities as required.
Tenderers must demonstrate previous experience of delivering comparable diagnostic imaging projects within operational NHS healthcare environments and possess demonstrable expertise in MRI refurbishment or replacement projects, Building Safety Act compliance and multidisciplinary design coordination.
To access this competition:
Registered:
Login to https://suppliers.multiquote.com and view the opportunity CA18284.
Not registered:
Visit https://suppliers.multiquote.com then register and quote CA18284 as the reason for registration.
Any queries please contact MultiQuote on 020 3920 8054.
文件
通过邮件接收这些招标
每天一封邮件,列出你所选行业和地区的新招标。无需账户或密码。
快速解答
这项招标什么时候截止?
已于2026年8月14日截止。
这份合同价值多少?
采购方估计金额为£40,000。
采购方是谁?
采购方是Epsom & St Helier University Hospitals NHS Trust。