SZC CWA - Pool Bunker Construction

Sizewell C Limited is looking for a supplier for "SZC CWA - Pool Bunker Construction". The estimated value is £20,000,000. Bids close on 25 November 2026 at 14:30.

Can I bid for this?

Make a free account to see how this tender fits your business and what it asks for.

Where and how to bid

  • The notice is published on Contracts Finder; the buyer's documents say where bids go in. Open Contracts Finder
  • The notice gives no closing date for questions; ask early.
  • Submit by 25 November 2026 at 14:30

What is this tender, in plain English?

This contract is for building a weather-tight and working Pool Bunker for Sizewell C. This facility will be used to assemble, weld, and inspect modules before they are moved to the Nuclear Island.

What does the buyer ask for?

  • Deliver a completed design to RIBA stage 4 and coordinated construction information.
  • Provide an approved contractor programme that matches project milestones.
  • Construct and commission the Pool Bunker, including the roof, cranes, platforms, access, and building services.
  • Complete all health, safety, quality, and assurance records.
  • Show how the Pool Bunker interfaces with the base slab, utilities, and non-destructive testing arrangements.
  • Formally hand over the completed bunker after an operational readiness review.

Who is this a good fit for?

This opportunity would suit a business with experience in large-scale construction, including steel frames, cladding, retractable roofs, and complex mechanical and electrical systems.

Written by AI from the notice. Check the original before you bid. The notice in full

Why could this be a fast result?

  • Closing soon
  • Small business friendly

What do past awards say about tenders like this?

  • Tenders like this drew about 6.7 bids each (17 awards gave a count).
  • Half of similar contracts were awarded between £11,170,395 and £21,500,000; the middle one was £17,842,041.

Based on 31 awards in the last 36 months: same trade, same region, similar value. Confidence: medium. This describes the past; it does not predict a result. Award data

The notice in full

The contract will deliver a commissioned, weathertight and operational Pool Bunker above the base slab. The facility will support assembly, welding and inspection activities before modules are transferred to the Nuclear Island. The scope of works includes: • Primary steel frame and crane runway beams. • Rainscreen cladding and industrial doors, with precast cladding retained as the alternative envelope. • Five-section retractable roof. • Secondary steelwork platforms, working levels and access arrangements. • Mechanical, electrical and public health services, including local exhaust ventilation, power, lighting and controls. • Passenger and goods hoists, stair cores and roof access. • Installation and commissioning of three free-issued gantry cranes. • Tented workshop, lightning protection and earthing. • Testing, commissioning, quality records and formal handover. The base slab and the separate site non-destructive testing contract are outside this sourcing strategy. Their interfaces will be defined in the tender documents and managed through the contract programme. The key scope deliverables are: • Completed design to RIBA stage 4 and coordinated construction information. • Approved contractor programme aligned to project milestones. • Constructed and commissioned Pool Bunker, including roof, cranes, platforms, access and building services. • Completed health, safety, quality and assurance records. • Demonstrated interfaces with the base slab, utilities and non-destructive testing arrangements. • Formal handover following operational readiness review. The timescales are as follows: The Pool Bunker is required to support the planned assembly, welding and inspection of pool and tank liner modules before transfer to the Nuclear Island. The current estimated site construction period is: • 40 weeks for the preferred rainscreen and Safe RAD solution. • 46 weeks for the 275 mm precast fallback solution. The current target is for the Pool Bunker to be completed and handed over by 28 February 2028, ready to support the planned assembly, welding and inspection of pool and tank liner modules. The programme is dependent on completion of the base slab and availability of the K10 area and will be revalidated once the K10 release date is confirmed.

Documents

Get these tenders by email

One email a day with new tenders for the trade and area you choose. No account or password needed.

We first email you a link to confirm. Nothing else is sent until you use it. Privacy notice

Quick answers

When is the deadline for this tender?

Bids close on 25 November 2026 at 14:30.

How much is this contract worth?

The buyer estimates £20,000,000.

Who is the buyer?

The buyer is Sizewell C Limited.

How do I bid for it?

You bid on the buyer's own portal, linked from the official notice on Contracts Finder. Rallybid helps you find and prepare; a person always submits.

Where do I send my bid?

The notice does not name a portal. The buyer's tender documents say where and how to submit.

How many businesses usually bid for a tender like this?

Tenders like this drew about 6.7 bids each (17 awards gave a count). Based on 31 awards in the last 36 months: same trade, same region, similar value. Confidence: medium. This describes the past; it does not predict a result.