Provision of UPS - MEICA-UPS-01

BIP SOLUTIONS LIMITED is looking for a supplier for "Provision of UPS - MEICA-UPS-01". The estimated value is £500,000. Bids close on 25 November 2026 at 14:55.

Can I bid for this?

Make a free account to see how this tender fits your business and what it asks for.

Where and how to bid

  • The notice is published on Contracts Finder; the buyer's documents say where bids go in. Open Contracts Finder
  • The notice gives no closing date for questions; ask early.
  • Submit by 25 November 2026 at 14:55

What is this tender, in plain English?

This tender is for the design, manufacturing, supply, delivery, testing, and commissioning of four complete Uninterruptible Power Supply (UPS) systems. These systems will be installed at three different locations: one in Stoneleigh, one in Canley Brook, and two in Burton Green, for BIP Solutions Limited.

What does the buyer ask for?

  • Each UPS must be rated at 210 kVA, 400 V, with 4 x 60 kW power modules and N+1 hot-swappable architecture.
  • Provide VRLA battery systems for 90 minutes of power at specified loads, recharging to 95% within 900 minutes.
  • Supply 250 kVA isolation transformers, Automatic Transfer Switches (ATS), and external maintenance bypass arrangements.
  • Include all interconnecting cables, battery cables, protective devices, and terminations.
  • Provide Building Management System (BMS) interfaces for monitoring battery and charger status.
  • Undertake factory acceptance testing (FAT), commissioning, site acceptance testing (SAT), and resistive load bank testing.

Who is this a good fit for?

This opportunity is suitable for businesses specialising in the design, manufacture, and installation of large-scale Uninterruptible Power Supply (UPS) systems and associated electrical infrastructure.

Written by AI from the notice. Check the original before you bid. The notice in full

Why could this be a fast result?

  • Closing soon

What do past awards say about tenders like this?

  • Tenders like this drew about 6.6 bids each (5 awards gave a count).
  • Half of similar contracts were awarded between £245,000 and £667,700; the middle one was £323,000.
  • John Roe Group has won 2 contracts of this kind from this buyer in the last three years.

Based on 21 awards in the last 36 months: same trade, same region, similar value. Confidence: medium. This describes the past; it does not predict a result. Award data

The notice in full

The Subcontractor shall design, manufacture, supply, deliver, test and commission 4 No. complete UPS systems: 1 No. at Stoneleigh, 1 No. at Canley Brook and 2 No. at Burton Green. 1. Technical Requirements Each UPS shall be rated at 210 kVA, 400 V, with 4 x 60 kW power modules and N+1 hot-swappable architecture. The Subcontractor shall demonstrate that the required connected load remains supported with one power module unavailable. Requirement Stoneleigh Canley Brook Burton Green Battery sizing load 35 kW 17 kW 70 kW Connected design load 31 kW TBC 66 kW Protection breaker 100 A 100 A 250 A Separate static switch N/A N/A 400 A, 400 V Each UPS shall provide an output fault current of 987 A for 200 ms. Supplier submissions shall demonstrate compatibility with the project protection requirements. 2. Batteries Provide complete VRLA battery systems, including racks/enclosures, interconnections, isolation and protection, delivering 90 minutes' autonomy at the specified battery sizing load. Batteries shall recharge to 95% within 900 minutes. Submit sizing and recharge calculations. 3. Transformers and Ancillary Equipment Provide 250 kVA, 1:1, Dzn0 input and output isolation transformers, together with ATS, static switching and external maintenance bypass arrangements required by the approved site-specific drawings. ATS shall be 400 A, four-pole where indicated. Include all interconnecting cables, battery cables, protective devices and terminations identified as the UPS supplier's responsibility. Coordinate interfaces with incoming supplies and UPS switchboards. 4. Monitoring Provide BMS interfaces for battery DC voltage, charge percentage, battery alarms/faults and charger status/alarms. Include communications protocols, interface hardware and point schedules for the UPS, ATS and UPS switchboard, with interface testing. 5. Delivery and Coordination Scheduled UPS cabinet dimensions are 1,200 W x 1,996 H x 1,100 D mm. Confirm complete equipment footprints, weights, clearances and delivery requirements before manufacture. 6. Testing and Handover Include FAT, commissioning, SAT and resistive load bank testing, with all temporary equipment, connections and removal. Demonstrate capacity, autonomy, recharge, redundancy, transfer/bypass operation, alarms and communications. Provide evidence of fault-current performance. Submit equipment drawings, schematics, protection data, test procedures/results, commissioning records, as-built information and O&M manuals. Suppliers shall identify proposed equipment and deviations. Confirm the missing Canley Brook design load, whether Burton Green loads apply per UPS, and site-specific equipment quantities and supply boundaries before manufacture. Additional information: Please review attached schematic and narrative specification.

Documents

Get these tenders by email

One email a day with new tenders for the trade and area you choose. No account or password needed.

We first email you a link to confirm. Nothing else is sent until you use it. Privacy notice

Quick answers

When is the deadline for this tender?

Bids close on 25 November 2026 at 14:55.

How much is this contract worth?

The buyer estimates £500,000.

Who is the buyer?

The buyer is BIP SOLUTIONS LIMITED.

How do I bid for it?

You bid on the buyer's own portal, linked from the official notice on Contracts Finder. Rallybid helps you find and prepare; a person always submits.

Where do I send my bid?

The notice does not name a portal. The buyer's tender documents say where and how to submit.

How many businesses usually bid for a tender like this?

Tenders like this drew about 6.6 bids each (5 awards gave a count). Based on 21 awards in the last 36 months: same trade, same region, similar value. Confidence: medium. This describes the past; it does not predict a result.