Skip to content
Rallybid

Awarded

Laser Induced Desorption System for Measuring First Wall Retention in STEP

UK Industrial Fusion Solutions Ltd has awarded this contract for "Laser Induced Desorption System for Measuring First Wall Retention in STEP".

This tender is closed to new bids. Similar open tenders

What is this tender, in plain English?

No plain-English summary yet.

What do past awards say about tenders like this?

  • Tenders like this drew about 2.7 bids each (11 awards gave a count).
  • Half of similar contracts were awarded between £52,552 and £148,468; the middle one was £86,151.

Based on 134 awards in the last 36 months: same trade, same region, similar value. Confidence: good. This describes the past; it does not predict a result. Award data

Who won this tender and for how much?

No award has been published for this tender yet.

The notice in full

UK Fusion Energy Ltd (UKFE) is seeking to appoint a supplier to undertake the concept design of a system capable of in-situ quantification of tritium retention within plasma-facing (first wall) materials for the Spherical Tokamak for Energy Production (STEP) programme. STEP is the UK's flagship fusion energy programme, sponsored by the Department for Energy Security and Net Zero (DESNZ), and aims to design and construct the UK's first prototype fusion power plant capable of demonstrating net energy production, fuel self-sufficiency and a viable route to plant maintenance. UKFE, a wholly owned subsidiary of the United Kingdom Atomic Energy Authority (UKAEA), is responsible for delivering the programme. A key challenge for future fusion power plants is the management of tritium, which serves as a fuel for the deuterium-tritium fusion reaction. Tritium is both radioactive and scarce, making accurate measurement of its retention within plasma-facing components essential to demonstrating fuel self-sufficiency, supporting tritium accountancy, and monitoring the condition of first wall materials throughout plant operation. The successful supplier will develop a concept design for a measurement system capable of operating within the demanding environment of a fusion power plant, taking into account constraints such as neutron radiation, strong magnetic fields, thermal loading, limited installation space, and exposure to radioactive materials. This procurement represents the initial concept design phase of a wider programme of work. Subject to future funding and programme approvals, the outputs of this contract are expected to inform subsequent detailed design activities, technology maturation, de-risking and testing, and ultimately the development of an integrated tritium measurement system for deployment within the STEP tokamak.

Documents

Get these tenders by email

One email a day with new tenders for the trade and area you choose. No account or password needed.

We first email you a link to confirm. Nothing else is sent until you use it. Privacy notice

Quick answers

When is the deadline for this tender?

It closed on 7 September 2026.

How much is this contract worth?

The buyer estimates £90,000.

Who is the buyer?

The buyer is UK Industrial Fusion Solutions Ltd.

How many businesses usually bid for a tender like this?

Tenders like this drew about 2.7 bids each (11 awards gave a count). Based on 134 awards in the last 36 months: same trade, same region, similar value. Confidence: good. This describes the past; it does not predict a result.

Similar open tenders