Skip to content
Rallybid

Closed

DNWP0016 - WAGR Enabling Works and Strip-out - Sellafield - A2R JV

Altrad AtkinsRealis Joint Venture (A2R JV) published this tender for "DNWP0016 - WAGR Enabling Works and Strip-out - Sellafield - A2R JV". It is now closed to new bids.

This tender is closed to new bids. Similar open tenders

What is this tender, in plain English?

This contract is for enabling works and strip-out services at the Windscale Advanced Gas-cooled Reactor (WAGR) facility in Sellafield. It involves preparing the site for final decommissioning and demolition, including managing radioactive waste and supporting wider decommissioning programmes.

What does the buyer ask for?

  • Handle and manage Low-Level Waste (LLW) and Intermediate-Level Waste (ILW) according to site requirements.
  • Carry out internal and external removal of fixtures, fittings, equipment, and non-structural elements.
  • Provide resources for asset reinstatement works.
  • Support gathering information and site characterisation.
  • Plan and conduct surveys for radiological, hazardous, and operational conditions.
  • Manage, design, and construct temporary works, including scaffolding and enclosures.
  • Undertake decontamination activities.
  • Provide scaffolding design, supply, and installation.

Written by AI from the notice. Check the original before you bid. The notice in full

What do past awards say about tenders like this?

  • Tenders like this drew about 9.6 bids each (7 awards gave a count).
  • Half of similar contracts were awarded between £12,740,425 and £25,000,000; the middle one was £18,180,396.

Based on 23 awards in the last 36 months: same trade, same region, similar value. Confidence: medium. This describes the past; it does not predict a result. Award data

Who won this tender and for how much?

No award has been published for this tender yet.

The notice in full

WAGR Overview and Site Information The Windscale Advanced Gas-cooled Reactor (WAGR), commissioned in 1962, was the prototype for the UK's second-generation Advanced Gas-cooled Reactor (AGR) fleet. The facility (Building B50), recognised by its distinctive spherical containment shell, was supported by the fuel assembly building (B52) and turbine hall (B55). Following reactor core dismantling and removal in 2012, the WAGR Complex entered Care and Maintenance (C&M). The facility is now progressing towards its final phase of decommissioning and demolition. Existing records confirm the presence of Low-Level Waste (LLW) and Intermediate-Level Waste (ILW), resulting in ongoing radiological and contamination hazards. All buildings within the WAGR area are owned by the Remediation operating unit, remain under active surveillance and maintenance, and are classified as Beta Gamma contamination facilities. Project Scope The scope comprises enabling, strip-out, waste management and decommissioning support activities across the WAGR facility, alongside support for wider Windscale decommissioning programmes and emergent operational requirements. Key activities include (see attachment) - Strip-out Works: Internal and external removal of fixtures, fittings, equipment and non-structural elements to facilitate future decommissioning and demolition activities. - Radiological Waste Management: Safe handling, removal and management of LLW and ILW in accordance with site requirements. - Asset Reinstatement: Delivery of asset reinstatement works and provision of SQEP resources to support successful handover. - Pre-Construction Information (PCI): Support information gathering and site characterisation where existing PCI is insufficient. - Surveys: Plan and undertake surveys to assess radiological, hazardous and operational conditions in support of future decommissioning works. - Project Enabling Works: Design, fabricate, trial and implement enabling solutions, equipment and materials to support project delivery. - Asbestos Management: Planning, sampling, monitoring and licensed asbestos removal where required. - Procurement: Procurement of materials, equipment and associated quality documentation. - Waste Management: Sorting, segregation, consolidation and disposal of current and historical wastes, including completion of documentation for transfer to Sellafield Waste Coordinators. - Emergent Works: Rapid response support to operations and maintenance teams for safety-critical issues. - Temporary Works: Management, design and construction of temporary works, including scaffolding, enclosures and other supporting structures. - Decontamination: Decontamination activities to support area declassification and radiological rollback. - Plant Modifications: Production of Plant Modification Proposals (PMPs) and associated documentation. - Scaffolding Services: Provision of scaffolding design, supply and installation resources as required. Additional information: https://www.linkedin.com/company/a2r-altrad-atkinsrealis-remediation https://www.gov.uk/government/news/sellafield-ltd-awards-high-hazard-risk-reduction-framework-contract

Documents

Get these tenders by email

One email a day with new tenders for the trade and area you choose. No account or password needed.

We first email you a link to confirm. Nothing else is sent until you use it. Privacy notice

Quick answers

When is the deadline for this tender?

It closed on 3 November 2026.

How much is this contract worth?

The buyer estimates £20,000,000.

Who is the buyer?

The buyer is Altrad AtkinsRealis Joint Venture (A2R JV).

How many businesses usually bid for a tender like this?

Tenders like this drew about 9.6 bids each (7 awards gave a count). Based on 23 awards in the last 36 months: same trade, same region, similar value. Confidence: medium. This describes the past; it does not predict a result.

Similar open tenders