Skip to content
Rallybid

Closed

DLSITT1097 - Main Septum Magnets for Diamond-II

DIAMOND LIGHT SOURCE LIMITED published this tender for "DLSITT1097 - Main Septum Magnets for Diamond-II". It is now closed to new bids.

This tender is closed to new bids.

What is this tender, in plain English?

This contract is for the detailed design, manufacture, quality control, testing, and delivery of two main septum magnets, with integrated vacuum vessels and support stands, plus spares. These magnets are for the Diamond-II upgrade at the Diamond Light Source facility in Oxfordshire, which is used by researchers to study materials at an atomic level.

Who is this a good fit for?

This opportunity would suit businesses with expertise in designing, manufacturing, and testing specialised magnetic equipment for scientific facilities.

Written by AI from the notice. Check the original before you bid. The notice in full

Who won this tender and for how much?

No award has been published for this tender yet.

The notice in full

Located on the Harwell Science & Innovation Campus in Oxfordshire, Diamond Light Source (DLS) is a leading-edge facility for science, engineering and innovation. DLS allows researchers from academia and industry to investigate the structure and behaviour of the world around us at the atomic and molecular level. To continue delivering the world-changing science that Diamond enables, the facility is being upgraded to Diamond-II, a co-ordinated programme of development that combines a major machine upgrade with new instruments and complementary improvements to optics, detectors, sample environment and delivery capabilities, and computing, as well as integrated and correlative methods. This will be transformative in speed and spatial resolution and will offer users streamlined access to enhanced instruments for life and physical sciences. The scope of this contract is to carry out the detailed design, manufacture, quality control, testing and delivery of two out-of-vacuum main DC/PM septum magnets, with integrated vacuum vessels, on support stands, as well as some spares. The two septum magnets are physically identical but will be installed with input and output ends inverted for booster extraction bend to the left, and storage ring injection bend to the right. This means that the magnet fields are also inverted, and also that the support frame should be rotationally symmetric so that the services connections are on the outside (bending channel side of the support frame) in each case. See specification for further details.

Documents

Get these tenders by email

One email a day with new tenders for the trade and area you choose. No account or password needed.

We first email you a link to confirm. Nothing else is sent until you use it. Privacy notice

Quick answers

When is the deadline for this tender?

It closed on 28 October 2026.

How much is this contract worth?

The buyer estimates £480,000.

Who is the buyer?

The buyer is DIAMOND LIGHT SOURCE LIMITED.